A platform for research: civil engineering, architecture and urbanism
Modular building construction method
The invention relates to the technical field of modular buildings, in particular to a modular building construction method which comprises the steps that fireproof structure installation, ground base layer treatment and keel pre-splicing installation are synchronously carried out; bathroom base plate installation and wall keel installation are synchronously carried out; fresh air installation, fire protection installation, integral bathroom installation and side wall installation are synchronously carried out; synchronously carrying out mechanical and electrical installation and inner wall keel installation; ceiling joist installation, bathroom top plate installation and wallboard rock wool filling are conducted synchronously; mounting ceiling veneers and sealing wallboards; and surface construction and edge closing are completed. According to the modular building construction method, the defect that in the prior art, a construction method of a unit module is low in production efficiency is overcome.
本发明涉及模块化建筑技术领域,具体涉及一种模块化建筑施工方法,包括同步进行防火构造安装、地面基层处理及龙骨预拼安装;同步进行卫浴底盘安装、墙龙骨安装;同步进行新风安装、消防安装、整体卫浴安装及侧墙安装;同步进行机电安装及内墙龙骨安装;同步进行吊顶龙骨安装、卫浴顶板安装及墙板岩棉填塞;天花饰面板安装及墙板封板;完成面施工及收边收口。本发明提供的模块化建筑施工方法解决了现有技术中的单元模块的施工方法生产效率较低的缺陷。
Modular building construction method
The invention relates to the technical field of modular buildings, in particular to a modular building construction method which comprises the steps that fireproof structure installation, ground base layer treatment and keel pre-splicing installation are synchronously carried out; bathroom base plate installation and wall keel installation are synchronously carried out; fresh air installation, fire protection installation, integral bathroom installation and side wall installation are synchronously carried out; synchronously carrying out mechanical and electrical installation and inner wall keel installation; ceiling joist installation, bathroom top plate installation and wallboard rock wool filling are conducted synchronously; mounting ceiling veneers and sealing wallboards; and surface construction and edge closing are completed. According to the modular building construction method, the defect that in the prior art, a construction method of a unit module is low in production efficiency is overcome.
本发明涉及模块化建筑技术领域,具体涉及一种模块化建筑施工方法,包括同步进行防火构造安装、地面基层处理及龙骨预拼安装;同步进行卫浴底盘安装、墙龙骨安装;同步进行新风安装、消防安装、整体卫浴安装及侧墙安装;同步进行机电安装及内墙龙骨安装;同步进行吊顶龙骨安装、卫浴顶板安装及墙板岩棉填塞;天花饰面板安装及墙板封板;完成面施工及收边收口。本发明提供的模块化建筑施工方法解决了现有技术中的单元模块的施工方法生产效率较低的缺陷。
Modular building construction method
一种模块化建筑施工方法
LENG HANYU (author) / XU HANG (author) / ZHANG WENCHEN (author) / WANG WEI (author) / ZHANG YU (author) / ZHOU PENG (author) / XU JUNKANG (author) / ZHU QI (author)
2022-05-20
Patent
Electronic Resource
Chinese
BUILDING MODULE, MODULAR BUILDING AND CONSTRUCTION METHOD FOR MODULAR BUILDING
European Patent Office | 2021
|