Modular building construction method
The invention relates to a modular building construction method, and relates to the technical field of modular buildings. The method comprises the following steps: S1, mounting a ring beam on a foundation; s2, concrete is poured into an inner cavity of the ring beam; s3, a reinforcement cage is pre-buried on the ring beam; s4, the foam modules are used for splicing and forming a wall body; s41, a first foam module is fixed to the ring beam, and a steel reinforcement framework is arranged in a cavity of the foam module in a penetrating mode; s42, the second foam module and the first foam module are spliced, and a gap between every two adjacent foam modules is sealed until a layer of wall is formed; s43, the step S42 is repeated on the basis of the upper layer of wall body until three layers of wall bodies are formed; s44, concrete is poured into an inner cavity of the three-layer wall body formed by the foam modules; s45, vibrating is carried out; and S5, the steps S42, S43 and S44 are repeated on the basis of the upper-layer wall body till the wall body structure is completely formed, and construction is completed. The method has the effect of reducing the waste of the concrete.
本申请涉及一种模块化建筑建设方法,涉及模块化建筑技术领域。其包括以下步骤:S1、在地基上安装圈梁;S2、在圈梁内腔浇筑混凝土;S3、在圈梁上预埋钢筋骨架;S4、使用泡沫模块拼接并成型墙体;S41、在圈梁上固定第一个泡沫模块,并使用钢筋骨架穿设于泡沫模块的空腔;S42、将第二个泡沫模块与第一个泡沫模块进行拼接,且对相邻两个泡沫模块的间隙进行密封,直至形成一层墙体;S43、在上一层墙体的基础上重复S42,直至形成三层墙体;S44、向泡沫模块形成的三层墙体内腔浇筑混凝土;S45、振捣;S5、在上一层墙体的基础上重复S42、S43以及S44,直至墙体结构完全成型,施工完毕。本申请具有减少混凝土的浪费的效果。
Modular building construction method
The invention relates to a modular building construction method, and relates to the technical field of modular buildings. The method comprises the following steps: S1, mounting a ring beam on a foundation; s2, concrete is poured into an inner cavity of the ring beam; s3, a reinforcement cage is pre-buried on the ring beam; s4, the foam modules are used for splicing and forming a wall body; s41, a first foam module is fixed to the ring beam, and a steel reinforcement framework is arranged in a cavity of the foam module in a penetrating mode; s42, the second foam module and the first foam module are spliced, and a gap between every two adjacent foam modules is sealed until a layer of wall is formed; s43, the step S42 is repeated on the basis of the upper layer of wall body until three layers of wall bodies are formed; s44, concrete is poured into an inner cavity of the three-layer wall body formed by the foam modules; s45, vibrating is carried out; and S5, the steps S42, S43 and S44 are repeated on the basis of the upper-layer wall body till the wall body structure is completely formed, and construction is completed. The method has the effect of reducing the waste of the concrete.
本申请涉及一种模块化建筑建设方法,涉及模块化建筑技术领域。其包括以下步骤:S1、在地基上安装圈梁;S2、在圈梁内腔浇筑混凝土;S3、在圈梁上预埋钢筋骨架;S4、使用泡沫模块拼接并成型墙体;S41、在圈梁上固定第一个泡沫模块,并使用钢筋骨架穿设于泡沫模块的空腔;S42、将第二个泡沫模块与第一个泡沫模块进行拼接,且对相邻两个泡沫模块的间隙进行密封,直至形成一层墙体;S43、在上一层墙体的基础上重复S42,直至形成三层墙体;S44、向泡沫模块形成的三层墙体内腔浇筑混凝土;S45、振捣;S5、在上一层墙体的基础上重复S42、S43以及S44,直至墙体结构完全成型,施工完毕。本申请具有减少混凝土的浪费的效果。
Modular building construction method
一种模块化建筑建设方法
LI CHAO (author) / HUANG TIEPING (author) / ZHANG JIANXU (author) / LI JING (author) / LI WEIJIE (author)
2023-05-16
Patent
Electronic Resource
Chinese