Iron tower single-pile combined foundation and construction method thereof
The invention relates to the field of iron tower construction, and discloses an iron tower foundation and a construction method thereof. The iron tower single-pile combined foundation comprises a foundation pile and a plurality of tower foot connecting beams, the foundation pile is located in the middle of the tower foot connecting beams, one end of each tower foot connecting beam is connected with the foundation pile, the other end of each tower foot connecting beam extends outwards in a diverging mode to form an extending part, and the extending part is provided with a tower foot connecting structure used for being connected with an iron tower leg. According to the single-pile combined foundation for the iron tower, only one foundation is excavated and poured in the center of the iron tower, the occupied land and excavation of the foundation are greatly reduced, the limitation of site conditions on the iron tower foundation is reduced, and meanwhile the influence and damage of the iron tower foundation on the periphery are reduced; the problems that multiple urban underground pipelines exist, four independent foundations in a mountainous area are difficult to construct, a movable soil area of a protection area is limited, and the influence of frost heaving on upward pulling of the foundations is large can be effectively solved.
本发明涉及铁塔施工领域,公开了一种铁塔基础及其施工方法。该铁塔单桩联合基础包括一根基桩和多根塔脚连接梁,所述基桩位于多根塔脚连接梁的中间,各所述塔脚连接梁一端均与基桩相连接、另一端向外发散延伸形成延伸部,所述延伸部设置有用于连接铁塔腿的塔脚连接结构。该铁塔单桩联合基础仅在铁塔中心开挖和浇筑一个基础,此基础大大减少基础占地及开挖,减少场地条件对于铁塔基础的限制,同时降低铁塔基础对周边的影响和破坏,能够有效解决城市地下管线多、山区四个独立基础建设困难、保护区动土区域限制、冻胀对基础上拔影响大等难题。
Iron tower single-pile combined foundation and construction method thereof
The invention relates to the field of iron tower construction, and discloses an iron tower foundation and a construction method thereof. The iron tower single-pile combined foundation comprises a foundation pile and a plurality of tower foot connecting beams, the foundation pile is located in the middle of the tower foot connecting beams, one end of each tower foot connecting beam is connected with the foundation pile, the other end of each tower foot connecting beam extends outwards in a diverging mode to form an extending part, and the extending part is provided with a tower foot connecting structure used for being connected with an iron tower leg. According to the single-pile combined foundation for the iron tower, only one foundation is excavated and poured in the center of the iron tower, the occupied land and excavation of the foundation are greatly reduced, the limitation of site conditions on the iron tower foundation is reduced, and meanwhile the influence and damage of the iron tower foundation on the periphery are reduced; the problems that multiple urban underground pipelines exist, four independent foundations in a mountainous area are difficult to construct, a movable soil area of a protection area is limited, and the influence of frost heaving on upward pulling of the foundations is large can be effectively solved.
本发明涉及铁塔施工领域,公开了一种铁塔基础及其施工方法。该铁塔单桩联合基础包括一根基桩和多根塔脚连接梁,所述基桩位于多根塔脚连接梁的中间,各所述塔脚连接梁一端均与基桩相连接、另一端向外发散延伸形成延伸部,所述延伸部设置有用于连接铁塔腿的塔脚连接结构。该铁塔单桩联合基础仅在铁塔中心开挖和浇筑一个基础,此基础大大减少基础占地及开挖,减少场地条件对于铁塔基础的限制,同时降低铁塔基础对周边的影响和破坏,能够有效解决城市地下管线多、山区四个独立基础建设困难、保护区动土区域限制、冻胀对基础上拔影响大等难题。
Iron tower single-pile combined foundation and construction method thereof
铁塔单桩联合基础及其施工方法
GUO YANJUN (author) / LI YE (author) / WU SHUWEI (author) / LIU QUAN (author) / LIU JIE (author) / LI GUO (author) / AN NING (author) / LIU HUAFENG (author) / ZHANG YONG (author)
2022-05-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Iron tower short pile-inclined anchor composite foundation and construction method thereof
European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2021
|Iron tower pile foundation structure and preparation method thereof
European Patent Office | 2021
|