Comprehensive pipe gallery integration module construction method
The invention provides a comprehensive pipe gallery integration module construction method, and belongs to the technical field of pipe gallery construction. The comprehensive pipe gallery integration module construction method is characterized in that a pipe gallery is constructed and installed after steel bars are bound on poured reinforced concrete guide walls on the two sides of a poured reinforced concrete bottom plate, the pipe gallery is divided into multiple sections for installation and construction, and the construction method comprises the following construction steps that S1, a first straight section is constructed, and the construction method comprises the following steps that 1, lines are snapped; (2) a transportation sliding rail and a guide rail are installed; (3) a wall formwork supporting structure in the cabin is installed; (4) part of matched functional vehicles are installed; 5) mounting an integrated top plate and a bracket; (6) other matched functional vehicles are installed; (7) an integrated inner wall formwork is installed; (8) the integrated outer wall formwork is installed; (9) steel bars are bound; and (10) pouring concrete. The construction period is short, the quality is high, and advanced investment and continuous construction of subsequent waterproofing, backfilling, ground recovery or road construction projects can be achieved.
本申请提供了一种综合管廊集成模块施工方法,属于管廊建设技术领域。该一种综合管廊集成模块施工方法,其特征在于,管廊在已浇筑钢筋混凝土底板两侧的已浇筑钢筋混凝土导墙上绑扎完钢筋后施工安装,且划分为多段安装施工,其施工步骤如下:S1:第一段平直段施工,施工方法分为如下步骤:1).弹线;2).运输滑轨及导向轨安装;3).舱内墙体模板支撑结构安装;4).部分配套功能车安装;5).集成顶板及支架安装;6).其余配套功能车安装;7).集成内墙模板安装;8).集成外墙模板安装;9).钢筋绑扎;10).混凝土浇筑。本申请施工工期较短且质量高,可实现后续防水、回填、地面恢复或者道路施工项目的提前投入和连续施工。
Comprehensive pipe gallery integration module construction method
The invention provides a comprehensive pipe gallery integration module construction method, and belongs to the technical field of pipe gallery construction. The comprehensive pipe gallery integration module construction method is characterized in that a pipe gallery is constructed and installed after steel bars are bound on poured reinforced concrete guide walls on the two sides of a poured reinforced concrete bottom plate, the pipe gallery is divided into multiple sections for installation and construction, and the construction method comprises the following construction steps that S1, a first straight section is constructed, and the construction method comprises the following steps that 1, lines are snapped; (2) a transportation sliding rail and a guide rail are installed; (3) a wall formwork supporting structure in the cabin is installed; (4) part of matched functional vehicles are installed; 5) mounting an integrated top plate and a bracket; (6) other matched functional vehicles are installed; (7) an integrated inner wall formwork is installed; (8) the integrated outer wall formwork is installed; (9) steel bars are bound; and (10) pouring concrete. The construction period is short, the quality is high, and advanced investment and continuous construction of subsequent waterproofing, backfilling, ground recovery or road construction projects can be achieved.
本申请提供了一种综合管廊集成模块施工方法,属于管廊建设技术领域。该一种综合管廊集成模块施工方法,其特征在于,管廊在已浇筑钢筋混凝土底板两侧的已浇筑钢筋混凝土导墙上绑扎完钢筋后施工安装,且划分为多段安装施工,其施工步骤如下:S1:第一段平直段施工,施工方法分为如下步骤:1).弹线;2).运输滑轨及导向轨安装;3).舱内墙体模板支撑结构安装;4).部分配套功能车安装;5).集成顶板及支架安装;6).其余配套功能车安装;7).集成内墙模板安装;8).集成外墙模板安装;9).钢筋绑扎;10).混凝土浇筑。本申请施工工期较短且质量高,可实现后续防水、回填、地面恢复或者道路施工项目的提前投入和连续施工。
Comprehensive pipe gallery integration module construction method
一种综合管廊集成模块施工方法
LIU JIANHUA (author) / LIU HONG (author) / LIU YUE (author)
2022-06-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foldable comprehensive pipe gallery pipe joint, comprehensive pipe gallery and construction method
European Patent Office | 2020
|Construction method of comprehensive pipe gallery and long-section pipe gallery
European Patent Office | 2022
|