Construction method of energy-saving thermal insulation wall and energy-saving thermal insulation wall
The invention discloses a construction method of an energy-saving thermal insulation wall and the energy-saving thermal insulation wall thereof. The energy-saving thermal insulation wall comprises an integrated thermal insulation and keel integrated unit component, a post-filling A-level thermal insulation board, a top keel, a filling thermal insulation layer and a base layer wall, the construction method comprises the following steps that S1, the hoisting frame is detachably connected to the integrated thermal insulation and keel integrated unit component hoisting; s2, hoisting the hoisting frame; s3, adopting inclined strut temporary connection; s4, the lifting frame is dismounted; s5, a top keel is installed; s6, the bottom and the top keel of the integrated thermal insulation and keel integrated unit component are both connected with beam column parts of the building; s7, a post-filling A-level heat preservation plate is installed at the position of the plate joint; s8, spraying and filling a thermal insulation layer; and S9, a base wall is constructed and installed. The lifting frame is convenient to disassemble and assemble and can be repeatedly used; installation is convenient, fast and efficient, and safety and stability are greatly improved. And the thermal insulation effect of the energy-saving thermal insulation wall is improved.
本发明公开了一种节能保温墙体的施工方法及其节能保温墙体,节能保温墙体包括集成保温与龙骨一体化单元构件、后补A级保温板、顶龙骨、填充保温层和基层墙,施工方法包括如下步骤:步骤S1、将吊装架可拆卸地连接于集成保温与龙骨一体化单元构件吊装上;步骤S2、吊起吊装架;步骤S3、采取斜撑临时连接;步骤S4、拆除吊装架;步骤S5、安装顶龙骨;步骤S6、将集成保温与龙骨一体化单元构件的底部和顶龙骨均与建筑物梁柱部位相连接;步骤S7、在板缝处安装后补A级保温板;步骤S8、喷涂填充保温层;步骤S9、施工安装基层墙。吊装架便于拆装,可重复使用;安装方便快捷效率高,大大提高了安全稳定性。提高了节能保温墙体的保温效果。
Construction method of energy-saving thermal insulation wall and energy-saving thermal insulation wall
The invention discloses a construction method of an energy-saving thermal insulation wall and the energy-saving thermal insulation wall thereof. The energy-saving thermal insulation wall comprises an integrated thermal insulation and keel integrated unit component, a post-filling A-level thermal insulation board, a top keel, a filling thermal insulation layer and a base layer wall, the construction method comprises the following steps that S1, the hoisting frame is detachably connected to the integrated thermal insulation and keel integrated unit component hoisting; s2, hoisting the hoisting frame; s3, adopting inclined strut temporary connection; s4, the lifting frame is dismounted; s5, a top keel is installed; s6, the bottom and the top keel of the integrated thermal insulation and keel integrated unit component are both connected with beam column parts of the building; s7, a post-filling A-level heat preservation plate is installed at the position of the plate joint; s8, spraying and filling a thermal insulation layer; and S9, a base wall is constructed and installed. The lifting frame is convenient to disassemble and assemble and can be repeatedly used; installation is convenient, fast and efficient, and safety and stability are greatly improved. And the thermal insulation effect of the energy-saving thermal insulation wall is improved.
本发明公开了一种节能保温墙体的施工方法及其节能保温墙体,节能保温墙体包括集成保温与龙骨一体化单元构件、后补A级保温板、顶龙骨、填充保温层和基层墙,施工方法包括如下步骤:步骤S1、将吊装架可拆卸地连接于集成保温与龙骨一体化单元构件吊装上;步骤S2、吊起吊装架;步骤S3、采取斜撑临时连接;步骤S4、拆除吊装架;步骤S5、安装顶龙骨;步骤S6、将集成保温与龙骨一体化单元构件的底部和顶龙骨均与建筑物梁柱部位相连接;步骤S7、在板缝处安装后补A级保温板;步骤S8、喷涂填充保温层;步骤S9、施工安装基层墙。吊装架便于拆装,可重复使用;安装方便快捷效率高,大大提高了安全稳定性。提高了节能保温墙体的保温效果。
Construction method of energy-saving thermal insulation wall and energy-saving thermal insulation wall
节能保温墙体的施工方法及其节能保温墙体
LIU BINGQIANG (author) / LIU NIANJIE (author)
2022-06-21
Patent
Electronic Resource
Chinese