A platform for research: civil engineering, architecture and urbanism
Drainage construction method for wall between piles
The invention discloses an inter-pile wall drainage construction method with a good drainage effect. Comprising the following steps that S1, a water diversion belt is installed on the wall face between the piles, and the water diversion belt passes through all water outlet positions on the wall face between the piles; a reinforcing mesh is installed on the wall face between the piles, a water drainage pipe is installed below the water diversion belt, the water drainage pipe is fixedly connected with the reinforcing mesh, and the water diversion belt is communicated with a water inlet of the water drainage pipe; and S2, cement mortar is sprayed to the wall face of the inter-pile wall and completely covers the reinforcing mesh, the inter-pile wall meeting the construction requirement is formed, and a water outlet of the water drainage pipe extends to the outer side of the inter-pile wall. The drainage problem of the inter-pile wall between the foundation pit supporting piles can be effectively solved, and the drainage effect is good. And therefore, hollowing and collapsing of the interior of the formed inter-pile wall are avoided, and the supporting effect of the inter-pile wall is good. And the construction cost is saved, the operation is convenient, and the construction efficiency is high.
本发明公开了一种排水效果好的桩间墙排水施工方法。包括如下步骤:S1,在桩间墙壁面上安装引水带,引水带经过桩间墙壁面上的各个出水位置;在桩间墙壁面上安装钢筋网,在引水带的下方安装泄水管,将泄水管与钢筋网连接固定,引水带与泄水管的进水口相连通;S2,向桩间墙壁面上喷射水泥砂浆,并完全覆盖钢筋网,形成符合施工要求的桩间墙,泄水管的出水口延伸至桩间墙外侧方。能有效解决基坑支护桩之间的桩间墙排水问题,排水效果好。进而避免成型后的桩间墙内部空鼓坍塌,桩间墙支护效果良好。还具有节约施工成本、操作方便、施工效率高等优势。
Drainage construction method for wall between piles
The invention discloses an inter-pile wall drainage construction method with a good drainage effect. Comprising the following steps that S1, a water diversion belt is installed on the wall face between the piles, and the water diversion belt passes through all water outlet positions on the wall face between the piles; a reinforcing mesh is installed on the wall face between the piles, a water drainage pipe is installed below the water diversion belt, the water drainage pipe is fixedly connected with the reinforcing mesh, and the water diversion belt is communicated with a water inlet of the water drainage pipe; and S2, cement mortar is sprayed to the wall face of the inter-pile wall and completely covers the reinforcing mesh, the inter-pile wall meeting the construction requirement is formed, and a water outlet of the water drainage pipe extends to the outer side of the inter-pile wall. The drainage problem of the inter-pile wall between the foundation pit supporting piles can be effectively solved, and the drainage effect is good. And therefore, hollowing and collapsing of the interior of the formed inter-pile wall are avoided, and the supporting effect of the inter-pile wall is good. And the construction cost is saved, the operation is convenient, and the construction efficiency is high.
本发明公开了一种排水效果好的桩间墙排水施工方法。包括如下步骤:S1,在桩间墙壁面上安装引水带,引水带经过桩间墙壁面上的各个出水位置;在桩间墙壁面上安装钢筋网,在引水带的下方安装泄水管,将泄水管与钢筋网连接固定,引水带与泄水管的进水口相连通;S2,向桩间墙壁面上喷射水泥砂浆,并完全覆盖钢筋网,形成符合施工要求的桩间墙,泄水管的出水口延伸至桩间墙外侧方。能有效解决基坑支护桩之间的桩间墙排水问题,排水效果好。进而避免成型后的桩间墙内部空鼓坍塌,桩间墙支护效果良好。还具有节约施工成本、操作方便、施工效率高等优势。
Drainage construction method for wall between piles
桩间墙排水施工方法
LI QINGLONG (author) / LIU KONGMING (author) / TANG XIAOLIN (author) / LYU HOUDONG (author) / LI XIN (author)
2022-07-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Method for supporting construction formwork of retaining wall between piles
European Patent Office | 2024
|Construction method for reverse molded retaining wall between piles through PC construction method
European Patent Office | 2022
|Construction method of retaining wall between vertical piles of side slope
European Patent Office | 2022
|WALL STRUCTURE CONSTRUCTION METHOD USING CAST IN PLACE PILES
European Patent Office | 2023
|