Comprehensive treatment method for low-liquid-limit silt roadbed
The invention discloses a comprehensive treatment method for a low-liquid-limit silt roadbed. The comprehensive treatment method is specifically implemented according to the following steps that 1, a pebble bed is replaced and filled; 2, a geotextile impermeable layer is arranged on the pebble bed in the step 1; 3, a silty soil embankment is arranged on the geotechnical cloth impermeable layer in the step 2, a pebble slope toe and a cement soil layer are arranged at the slope toe of the silty soil embankment, and the silty soil embankment is wrapped by geotechnical cloth; 4, a cement soil area is arranged on the silty soil embankment in the step 3; and step 5, arranging a road surface and a road shoulder on the cement soil area in the step 4. According to the comprehensive treatment method for the low-liquid-limit silt roadbed, the problem of treatment of the liquid-limit silt roadbed is solved.
本发明公开了一种低液限粉土路基综合处治方法,具体按照以下步骤实施:步骤1,换填卵石层;步骤2,在步骤1的卵石层上布置土工布防渗层;步骤3,在步骤2的土工布防渗层上布置粉性土路堤,并在粉性土路堤的坡脚出布置卵石坡脚和水泥土层,所述粉性土路堤通过土工布包层;步骤4,在步骤3的粉性土路堤上布置水泥土区;步骤5,在步骤4的水泥土区上布置路面和路肩。该低液限粉土路基综合处治方法,解决了液限粉土的地基处理问题。
Comprehensive treatment method for low-liquid-limit silt roadbed
The invention discloses a comprehensive treatment method for a low-liquid-limit silt roadbed. The comprehensive treatment method is specifically implemented according to the following steps that 1, a pebble bed is replaced and filled; 2, a geotextile impermeable layer is arranged on the pebble bed in the step 1; 3, a silty soil embankment is arranged on the geotechnical cloth impermeable layer in the step 2, a pebble slope toe and a cement soil layer are arranged at the slope toe of the silty soil embankment, and the silty soil embankment is wrapped by geotechnical cloth; 4, a cement soil area is arranged on the silty soil embankment in the step 3; and step 5, arranging a road surface and a road shoulder on the cement soil area in the step 4. According to the comprehensive treatment method for the low-liquid-limit silt roadbed, the problem of treatment of the liquid-limit silt roadbed is solved.
本发明公开了一种低液限粉土路基综合处治方法,具体按照以下步骤实施:步骤1,换填卵石层;步骤2,在步骤1的卵石层上布置土工布防渗层;步骤3,在步骤2的土工布防渗层上布置粉性土路堤,并在粉性土路堤的坡脚出布置卵石坡脚和水泥土层,所述粉性土路堤通过土工布包层;步骤4,在步骤3的粉性土路堤上布置水泥土区;步骤5,在步骤4的水泥土区上布置路面和路肩。该低液限粉土路基综合处治方法,解决了液限粉土的地基处理问题。
Comprehensive treatment method for low-liquid-limit silt roadbed
一种低液限粉土路基综合处治方法
RONG HONGLIU (author) / PAN MINQIANG (author) / YANG XIAOLONG (author) / LIANG JUNLIN (author) / MENG YONGJUN (author) / LIU YUSONG (author)
2022-07-22
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Environment-friendly low-liquid-limit-silt roadbed improvement method
European Patent Office | 2020
|Silt roadbed drainage anti-seepage structure and construction technology
European Patent Office | 2024
|High-temperature-resistant rut pavement structure suitable for silt roadbed
European Patent Office | 2022
|Riprap silt squeezing construction method for wading roadbed and slope protection structure
European Patent Office | 2023
|