A platform for research: civil engineering, architecture and urbanism
Improvement method for low-liquid-limit silt roadbed
The invention relates to an improvement method for a low-liquid-limit silt roadbed, and belongs to the technical field of soil roadbed construction. The improvement method mainly comprises the steps that 1 low-liquid-limit silt is stirred in stirring equipment for a preset time; 2 the stirred low-liquid-limit silt is placed in spreading equipment to be stirred for the second time; 3 the low-liquid-limit silt is discharged by using a discharging device of the spreading equipment; 4 the low-liquid-limit silt falling from the discharging device is flattened through a flattening device of the spreading equipment to form a low-liquid-limit silt layer; and 5 the low-liquid-limit silt layer flattened by the spreading equipment is compacted through rolling equipment so as to form the required roadbed. When the soil roadbed improvement method is used, manual work can be replaced to automatically and uniformly lay the low-liquid-limit silt soil, time and labor are saved, the laying effect is good, and the working efficiency can be effectively improved.
本申请涉及一种低液限粉土路基改良方法,属于土路基施工技术领域,其主要方案,包括如下步骤:步骤一:将低液限粉土置于搅拌设备中搅拌预定的时间;步骤二:将完成搅拌的低液限粉土置于铺料设备中进行二次搅拌;步骤三:利用铺料设备的下料装置进行低液限粉土的下料;步骤四:利用铺料设备的摊平装置对下料装置落下的低液限粉土进行摊平以形成低液限粉土层;步骤五:利用辊压设备对铺料设备摊平的低液限粉土层进行压实处理以形成所需的路基。本申请的土路基改良方法在使用时,能够代替人工自动的对低液限粉土进行均匀的铺设,省时省力,而且铺设效果好,可以有效提高工作效率。
Improvement method for low-liquid-limit silt roadbed
The invention relates to an improvement method for a low-liquid-limit silt roadbed, and belongs to the technical field of soil roadbed construction. The improvement method mainly comprises the steps that 1 low-liquid-limit silt is stirred in stirring equipment for a preset time; 2 the stirred low-liquid-limit silt is placed in spreading equipment to be stirred for the second time; 3 the low-liquid-limit silt is discharged by using a discharging device of the spreading equipment; 4 the low-liquid-limit silt falling from the discharging device is flattened through a flattening device of the spreading equipment to form a low-liquid-limit silt layer; and 5 the low-liquid-limit silt layer flattened by the spreading equipment is compacted through rolling equipment so as to form the required roadbed. When the soil roadbed improvement method is used, manual work can be replaced to automatically and uniformly lay the low-liquid-limit silt soil, time and labor are saved, the laying effect is good, and the working efficiency can be effectively improved.
本申请涉及一种低液限粉土路基改良方法,属于土路基施工技术领域,其主要方案,包括如下步骤:步骤一:将低液限粉土置于搅拌设备中搅拌预定的时间;步骤二:将完成搅拌的低液限粉土置于铺料设备中进行二次搅拌;步骤三:利用铺料设备的下料装置进行低液限粉土的下料;步骤四:利用铺料设备的摊平装置对下料装置落下的低液限粉土进行摊平以形成低液限粉土层;步骤五:利用辊压设备对铺料设备摊平的低液限粉土层进行压实处理以形成所需的路基。本申请的土路基改良方法在使用时,能够代替人工自动的对低液限粉土进行均匀的铺设,省时省力,而且铺设效果好,可以有效提高工作效率。
Improvement method for low-liquid-limit silt roadbed
一种低液限粉土路基改良方法
LIU LEILEI (author) / XU JINJIN (author) / DU WENDONG (author)
2021-08-27
Patent
Electronic Resource
Chinese
Environment-friendly low-liquid-limit-silt roadbed improvement method
European Patent Office | 2020
|Comprehensive treatment method for low-liquid-limit silt roadbed
European Patent Office | 2022
|Silt roadbed drainage anti-seepage structure and construction technology
European Patent Office | 2024
|