A platform for research: civil engineering, architecture and urbanism
Prefabricated building prefabricated PC board and wire pipe integrated construction method
The invention discloses an assembly type building prefabricated PC board and wire pipe integrated construction method, which comprises a building prefabricated PC board wire pipe and an assembly type building prefabricated PC board and wire pipe integrated construction method, the building prefabricated PC board wire pipe is composed of a PC board, a wire pipe and a wire box, the PC board is provided with an aluminum mold, the aluminum mold is fixed on the PC board through a screw, and the wire box is fixed on the PC board. The aluminum mold is provided with a line connecting port, a fixing base is arranged at the side end of the PC board and fixed to a side end board body of the PC board through screws, a reinforcing steel bar and a reinforcing steel bar frame are arranged on a middle board body of the PC board, the reinforcing steel bar frame is located on the reinforcing steel bar, and the reinforcing steel bar and the reinforcing steel bar frame are distributed in a crossed mode. According to the construction method, on-site complex work is solved in a factory, the labor cost is greatly reduced, the labor intensity is reduced, the on-site progress is improved, the cost is reduced, the efficiency is improved, and great economic and social benefits are obtained.
本发明公开了一种装配式建筑预制PC板线管一体化施工工法,包括建筑预制PC板线管和装配式建筑预制PC板线管一体化施工工法,所述建筑预制PC板线管,由PC板、线管和线盒构成,所述PC板上设有铝模,所述铝模通过螺丝固定于PC板上,所述铝模上设有线路连接口,所述PC板侧端设有固定座,所述固定座通过螺丝固定于PC板的侧端板体上,所述PC板的中间板体上设有钢筋和钢筋架,所述钢筋架位于钢筋上且钢筋和钢筋架之间呈交叉式排列分布,本发明的施工工法将现场复杂的工作前置在工厂解决,也极大地降低了人工成本,减少劳动强度,提升现场进度,降本增效,取得了极大的经济和社会效益。
Prefabricated building prefabricated PC board and wire pipe integrated construction method
The invention discloses an assembly type building prefabricated PC board and wire pipe integrated construction method, which comprises a building prefabricated PC board wire pipe and an assembly type building prefabricated PC board and wire pipe integrated construction method, the building prefabricated PC board wire pipe is composed of a PC board, a wire pipe and a wire box, the PC board is provided with an aluminum mold, the aluminum mold is fixed on the PC board through a screw, and the wire box is fixed on the PC board. The aluminum mold is provided with a line connecting port, a fixing base is arranged at the side end of the PC board and fixed to a side end board body of the PC board through screws, a reinforcing steel bar and a reinforcing steel bar frame are arranged on a middle board body of the PC board, the reinforcing steel bar frame is located on the reinforcing steel bar, and the reinforcing steel bar and the reinforcing steel bar frame are distributed in a crossed mode. According to the construction method, on-site complex work is solved in a factory, the labor cost is greatly reduced, the labor intensity is reduced, the on-site progress is improved, the cost is reduced, the efficiency is improved, and great economic and social benefits are obtained.
本发明公开了一种装配式建筑预制PC板线管一体化施工工法,包括建筑预制PC板线管和装配式建筑预制PC板线管一体化施工工法,所述建筑预制PC板线管,由PC板、线管和线盒构成,所述PC板上设有铝模,所述铝模通过螺丝固定于PC板上,所述铝模上设有线路连接口,所述PC板侧端设有固定座,所述固定座通过螺丝固定于PC板的侧端板体上,所述PC板的中间板体上设有钢筋和钢筋架,所述钢筋架位于钢筋上且钢筋和钢筋架之间呈交叉式排列分布,本发明的施工工法将现场复杂的工作前置在工厂解决,也极大地降低了人工成本,减少劳动强度,提升现场进度,降本增效,取得了极大的经济和社会效益。
Prefabricated building prefabricated PC board and wire pipe integrated construction method
一种装配式建筑预制PC板线管一体化施工工法
JI AN (author) / LI XIUFEI (author) / GUO SHILIN (author) / HUANG YANZHAO (author) / LU JIAPENG (author)
2022-07-26
Patent
Electronic Resource
Chinese
CONSTRUCTION METHOD OF PREFABRICATED BUILDING AND PREFABRICATED BUILDING
European Patent Office | 2019
|Method for producing prefabricated building board and prefabricated building board
European Patent Office | 2023
|European Patent Office | 2023
|