A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of building construction, and particularly relates to a template device for an expansion joint position during main body structure construction, which comprises a template I, a template II and a folding mechanism, the folding mechanism is installed between the first template and the second template and can adjust the distance between the first template and the second template. In the construction state, the first formwork and the second formwork are vertical and located at the two ends of the expansion joint respectively. After construction is finished, the formwork device is taken out and reused in subsequent construction; compared with the prior art, the problem that a formwork at the position of an expansion joint is inconvenient to erect during construction of a building main body structure is solved; (2) the template device is convenient to mount and dismount, simple and convenient to operate, environment-friendly, energy-saving, wide in application range and applicable to construction of the building base main body with the expansion joint; and (3) when the template device is in a working state, the template I and the template II are supported and reinforced through the connecting rod, so that the template in the expansion joint is very stable.
本发明属于建筑施工技术领域,具体涉及一种用于主体结构施工时伸缩缝位置的模板装置,包括模板一、模板二和折叠机构;折叠机构安装在模板一和模板二之间,并且能够调节模板一和模板二的间距;施工状态时,模板一和模板二竖直且分别处于伸缩缝的两端;施工结束后,将模板装置取出并在之后的施工中重复利用;相比现有技术,(1)本发明解决了建筑主体结构施工时伸缩缝位置模板不便架设的问题;(2)本发明的模板装置安装和拆除方便,操作简便,环保节能,适用范围广,含伸缩缝的楼座主体施工时均可适用;(3)模板装置在工作状态时,模板一和模板二之间通过连接杆支撑加固,使得伸缩缝中的模板非常的稳固。
The invention belongs to the technical field of building construction, and particularly relates to a template device for an expansion joint position during main body structure construction, which comprises a template I, a template II and a folding mechanism, the folding mechanism is installed between the first template and the second template and can adjust the distance between the first template and the second template. In the construction state, the first formwork and the second formwork are vertical and located at the two ends of the expansion joint respectively. After construction is finished, the formwork device is taken out and reused in subsequent construction; compared with the prior art, the problem that a formwork at the position of an expansion joint is inconvenient to erect during construction of a building main body structure is solved; (2) the template device is convenient to mount and dismount, simple and convenient to operate, environment-friendly, energy-saving, wide in application range and applicable to construction of the building base main body with the expansion joint; and (3) when the template device is in a working state, the template I and the template II are supported and reinforced through the connecting rod, so that the template in the expansion joint is very stable.
本发明属于建筑施工技术领域,具体涉及一种用于主体结构施工时伸缩缝位置的模板装置,包括模板一、模板二和折叠机构;折叠机构安装在模板一和模板二之间,并且能够调节模板一和模板二的间距;施工状态时,模板一和模板二竖直且分别处于伸缩缝的两端;施工结束后,将模板装置取出并在之后的施工中重复利用;相比现有技术,(1)本发明解决了建筑主体结构施工时伸缩缝位置模板不便架设的问题;(2)本发明的模板装置安装和拆除方便,操作简便,环保节能,适用范围广,含伸缩缝的楼座主体施工时均可适用;(3)模板装置在工作状态时,模板一和模板二之间通过连接杆支撑加固,使得伸缩缝中的模板非常的稳固。
Formwork device for expansion joint position during main body structure construction
一种用于主体结构施工时伸缩缝位置的模板装置
GAO XIANG (author)
2022-07-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork structure for building main body structure construction
European Patent Office | 2021
|Construction technology of expansion joint large formwork expansion device
European Patent Office | 2022
|Formwork construction method for cantilever structure of building main body
European Patent Office | 2021
|