High-rise building blasting demolition method
The invention relates to the technical field of building blasting demolition, in particular to a high-rise building blasting demolition method, and aims to solve the problems that the existing building blasting demolition technology still has low blasting completion rate caused by incomplete blasting technology and lack of supervision and execution standards of work, and resource waste caused by lack of treatment of barren rocks after blasting. According to the technical scheme, the method comprises the following steps of S1, preparing, S2, arranging notches, S3, pre-dismantling, S4, drilling and S5, detonating, and aims to improve the completion rate of building blasting by perfecting the blasting technology and strengthening supervision work in the blasting process, and meanwhile, waste of resources is reduced by recycling waste rocks generated by blasting.
本发明涉及建筑物爆破拆除技术领域,尤其涉及一种高层建筑物爆破拆除方法,针对当前现有的建筑物爆破拆除技术仍存在爆破技术不完善、工作缺乏监督与执行标准导致爆破完成率低,且爆破后对于废石缺少处理导致资源浪费的问题,现提出如下方案,其中包括以下步骤:S1:进行准备,S2:切口布置,S3:预拆除,S4:进行钻孔,S5:进行起爆,本发明的目的是通过完善爆破技术,并在爆破过程中加强监督工作,提高了建筑爆破的完成率,同时通过对爆破产生的废石进行回收利用,减少了资源的浪费。
High-rise building blasting demolition method
The invention relates to the technical field of building blasting demolition, in particular to a high-rise building blasting demolition method, and aims to solve the problems that the existing building blasting demolition technology still has low blasting completion rate caused by incomplete blasting technology and lack of supervision and execution standards of work, and resource waste caused by lack of treatment of barren rocks after blasting. According to the technical scheme, the method comprises the following steps of S1, preparing, S2, arranging notches, S3, pre-dismantling, S4, drilling and S5, detonating, and aims to improve the completion rate of building blasting by perfecting the blasting technology and strengthening supervision work in the blasting process, and meanwhile, waste of resources is reduced by recycling waste rocks generated by blasting.
本发明涉及建筑物爆破拆除技术领域,尤其涉及一种高层建筑物爆破拆除方法,针对当前现有的建筑物爆破拆除技术仍存在爆破技术不完善、工作缺乏监督与执行标准导致爆破完成率低,且爆破后对于废石缺少处理导致资源浪费的问题,现提出如下方案,其中包括以下步骤:S1:进行准备,S2:切口布置,S3:预拆除,S4:进行钻孔,S5:进行起爆,本发明的目的是通过完善爆破技术,并在爆破过程中加强监督工作,提高了建筑爆破的完成率,同时通过对爆破产生的废石进行回收利用,减少了资源的浪费。
High-rise building blasting demolition method
一种高层建筑物爆破拆除方法
DAI LIN (author) / HUANG ZHIYONG (author) / DAI JIAHUI (author)
2022-08-05
Patent
Electronic Resource
Chinese
Anti-backseat impact-reducing blasting demolition method for high-rise building
European Patent Office | 2023
|High-rise building demolition equipment and high-rise building demolition method
European Patent Office | 2023
|High-rise building demolition robot and demolition method thereof
European Patent Office | 2024
|DEMOLITION SYSTEM AND DEMOLITION METHOD FOR HIGH-RISE BUILDING
European Patent Office | 2017
|