Glutinous rice mortar paving construction method
A glutinous rice mortar paving construction method comprises the following steps that firstly, a strip stone surface on which glutinous rice mortar is to be paved is cleaned, and the strip stone surface is kept wet; 2, the mixed glutinous rice mortar is laid in gaps between the strip stones, and vertical reserved pipes and horizontal reserved pipes are buried while laying is conducted; 3, before initial setting of the glutinous rice mortar, the reserved pipe is pulled out, and a long and thin hole communicated with the outside is formed in the glutinous rice mortar; 4, the strip stone area where the sticky rice mortar is laid is wrapped with an airtight film material, and carbon dioxide is filled between the airtight film material and the strip stone and between the airtight film material and the sticky rice mortar for curing; 5, the airtight membrane material is removed; and sixthly, the first step to the fifth step are repeated till the sticky rice mortar of the boulder retaining wall is laid, and boulder masonry is completed. According to the invention, the early-stage shear-resistant bonding strength and uniformity of the sticky rice mortar of the stone strip retaining wall are improved.
一种糯米灰浆铺筑施工方法,包括以下步骤:步骤一,清洗干净待铺放糯米灰浆的条石面,条石面保持湿润;步骤二,拌制好的糯米灰浆,铺放至条石之间的缝隙,边铺放边埋设竖向预留管和水平预留管;步骤三,在糯米灰浆初凝前,拔出预留管,使糯米灰浆内部形成与外部连通的细长孔洞;步骤四,用不透气膜材包封已铺放糯米灰浆的条石区,并在所述不透气膜材与条石、糯米灰浆之间充入二氧化碳养护;步骤五,拆除所述不透气膜材;步骤六,重复步骤一~步骤五,直到条石挡墙的糯米灰浆铺放、条石砌筑完毕。本发明提高条石挡墙糯米灰浆早期抗剪粘接强度及其均匀性。
Glutinous rice mortar paving construction method
A glutinous rice mortar paving construction method comprises the following steps that firstly, a strip stone surface on which glutinous rice mortar is to be paved is cleaned, and the strip stone surface is kept wet; 2, the mixed glutinous rice mortar is laid in gaps between the strip stones, and vertical reserved pipes and horizontal reserved pipes are buried while laying is conducted; 3, before initial setting of the glutinous rice mortar, the reserved pipe is pulled out, and a long and thin hole communicated with the outside is formed in the glutinous rice mortar; 4, the strip stone area where the sticky rice mortar is laid is wrapped with an airtight film material, and carbon dioxide is filled between the airtight film material and the strip stone and between the airtight film material and the sticky rice mortar for curing; 5, the airtight membrane material is removed; and sixthly, the first step to the fifth step are repeated till the sticky rice mortar of the boulder retaining wall is laid, and boulder masonry is completed. According to the invention, the early-stage shear-resistant bonding strength and uniformity of the sticky rice mortar of the stone strip retaining wall are improved.
一种糯米灰浆铺筑施工方法,包括以下步骤:步骤一,清洗干净待铺放糯米灰浆的条石面,条石面保持湿润;步骤二,拌制好的糯米灰浆,铺放至条石之间的缝隙,边铺放边埋设竖向预留管和水平预留管;步骤三,在糯米灰浆初凝前,拔出预留管,使糯米灰浆内部形成与外部连通的细长孔洞;步骤四,用不透气膜材包封已铺放糯米灰浆的条石区,并在所述不透气膜材与条石、糯米灰浆之间充入二氧化碳养护;步骤五,拆除所述不透气膜材;步骤六,重复步骤一~步骤五,直到条石挡墙的糯米灰浆铺放、条石砌筑完毕。本发明提高条石挡墙糯米灰浆早期抗剪粘接强度及其均匀性。
Glutinous rice mortar paving construction method
一种糯米灰浆铺筑施工方法
CHEN ZHENHUA (author) / WEI XIAOWANG (author) / NI LANBIAO (author) / YIN MING (author) / SHEN KAOSHAN (author) / WU XINGLONG (author)
2022-08-30
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Preparation method of nanocellulose/glutinous rice mortar hybrid material
European Patent Office | 2024
|Preparation method of early-strength glutinous rice mortar material
European Patent Office | 2020
|Preparation of modified glutinous rice mortar with high bonding strength
European Patent Office | 2024
|European Patent Office | 2022
|