A platform for research: civil engineering, architecture and urbanism
Heat-insulating bridge structure of sandwich heat-insulating external wall panel and construction process of heat-insulating bridge structure
The heat bridge breaking structure comprises a floor slab and a wall body supported on the floor slab, the wall body sequentially comprises an AAC inner wall plate, a sandwich heat preservation material and an AAC outer wall plate from inside to outside, and high-strength heat insulation cushion blocks are installed at the positions, making contact with the floor slab, of the AAC outer wall plate at intervals. Heat preservation materials are arranged between the spaced high-strength heat insulation cushion blocks, and the AAC external wall panel is supported on the high-strength heat insulation cushion blocks and the heat preservation materials. By arranging the high-strength heat insulation cushion block and the heat preservation material, the load requirement of the bottom of the AAC wallboard is met, continuity of the heat preservation material is achieved, and meanwhile the air tightness of the bottom of the outer wallboard is guaranteed.
本发明公开的一种夹心保温外墙板的断热桥结构,包括楼板、支撑在所述楼板上的墙体,所述墙体自内而外依次包括AAC内墙板、夹心保温材料和AAC外墙板,所述AAC外墙板与楼板接触的位置间隔的安装有高强隔热垫块,间隔的所述高强隔热垫块之间设有保温材料,所述AAC外墙板支撑在高强隔热垫块和保温材料上。通过设置高强隔热垫块和保温材料,既满足了AAC墙板底部的荷载需求,又实现了保温材料的连续性,同时保证了外墙板底部的气密性。
Heat-insulating bridge structure of sandwich heat-insulating external wall panel and construction process of heat-insulating bridge structure
The heat bridge breaking structure comprises a floor slab and a wall body supported on the floor slab, the wall body sequentially comprises an AAC inner wall plate, a sandwich heat preservation material and an AAC outer wall plate from inside to outside, and high-strength heat insulation cushion blocks are installed at the positions, making contact with the floor slab, of the AAC outer wall plate at intervals. Heat preservation materials are arranged between the spaced high-strength heat insulation cushion blocks, and the AAC external wall panel is supported on the high-strength heat insulation cushion blocks and the heat preservation materials. By arranging the high-strength heat insulation cushion block and the heat preservation material, the load requirement of the bottom of the AAC wallboard is met, continuity of the heat preservation material is achieved, and meanwhile the air tightness of the bottom of the outer wallboard is guaranteed.
本发明公开的一种夹心保温外墙板的断热桥结构,包括楼板、支撑在所述楼板上的墙体,所述墙体自内而外依次包括AAC内墙板、夹心保温材料和AAC外墙板,所述AAC外墙板与楼板接触的位置间隔的安装有高强隔热垫块,间隔的所述高强隔热垫块之间设有保温材料,所述AAC外墙板支撑在高强隔热垫块和保温材料上。通过设置高强隔热垫块和保温材料,既满足了AAC墙板底部的荷载需求,又实现了保温材料的连续性,同时保证了外墙板底部的气密性。
Heat-insulating bridge structure of sandwich heat-insulating external wall panel and construction process of heat-insulating bridge structure
一种夹心保温外墙板的断热桥结构及施工工艺
SUN CHAO (author) / LU SHENGTAO (author) / WANG ZHONGCAI (author) / SHI LINXIA (author) / FENG CHAO (author) / LI TONG (author) / ZHANG JIE (author) / LI JIAN (author) / WANG SHI (author) / WANG XIAO (author)
2022-09-13
Patent
Electronic Resource
Chinese
European Patent Office | 2018
|