Construction platform and construction technology for stay cable sliding and horizontal cable displacement
The construction platform comprises an I-shaped steel rail, a plurality of horizontal supporting arms are arranged at the top of the I-shaped steel rail, and the tail end of each horizontal supporting arm is fixed to the top of a building; two first pulleys are arranged on the I-shaped steel rail, a second pulley is arranged on the outer side of each first pulley, a platform lifting rope is arranged at the bottom of each first pulley, and the tail ends of the platform lifting ropes are fixedly connected with lifting motors fixed to the two ends of the construction platform respectively; a climbing steel cable is arranged at the bottom of each second pulley, the bottom end of each climbing steel cable is fixedly connected with a ground anchor pulling steel piece on the ground, and each ground anchor pulling steel piece is fixedly connected with the ground through an anchor bolt; each climbing steel rope is sleeved with an annular slip rope, and each slip rope can slide on the climbing steel rope; the slip ropes are connected with horizontal ropes, and the tail ends of the horizontal ropes are fixedly connected with electric hoists fixed to the two ends of the construction platform respectively.
一种斜索滑行与水平索位移的施工平台及施工工艺,施工平台包括工字钢轨道,该工字钢轨道顶部设有若干水平支臂,各水平支臂的末端固定在建筑顶部;该工字钢轨道上设有两个第一滑车,两个第一滑车外侧分别设有一个第二滑车,各第一滑车底部设有平台升降绳,各平台升降绳末端分别与固定在施工平台的两端的升降电机固定连接;各第二滑车底部设有爬升钢索,各爬升钢索的底端与地面上的地锚拉结钢件固定连接,各地锚拉结钢件通过锚栓与地面固定连接;各爬升钢索上套设有环形的滑索,各滑索能在该爬升钢索上滑动;各滑索连接水平绳索,各水平绳索末端分别与固定在该施工平台两端的电动葫芦固定连接。
Construction platform and construction technology for stay cable sliding and horizontal cable displacement
The construction platform comprises an I-shaped steel rail, a plurality of horizontal supporting arms are arranged at the top of the I-shaped steel rail, and the tail end of each horizontal supporting arm is fixed to the top of a building; two first pulleys are arranged on the I-shaped steel rail, a second pulley is arranged on the outer side of each first pulley, a platform lifting rope is arranged at the bottom of each first pulley, and the tail ends of the platform lifting ropes are fixedly connected with lifting motors fixed to the two ends of the construction platform respectively; a climbing steel cable is arranged at the bottom of each second pulley, the bottom end of each climbing steel cable is fixedly connected with a ground anchor pulling steel piece on the ground, and each ground anchor pulling steel piece is fixedly connected with the ground through an anchor bolt; each climbing steel rope is sleeved with an annular slip rope, and each slip rope can slide on the climbing steel rope; the slip ropes are connected with horizontal ropes, and the tail ends of the horizontal ropes are fixedly connected with electric hoists fixed to the two ends of the construction platform respectively.
一种斜索滑行与水平索位移的施工平台及施工工艺,施工平台包括工字钢轨道,该工字钢轨道顶部设有若干水平支臂,各水平支臂的末端固定在建筑顶部;该工字钢轨道上设有两个第一滑车,两个第一滑车外侧分别设有一个第二滑车,各第一滑车底部设有平台升降绳,各平台升降绳末端分别与固定在施工平台的两端的升降电机固定连接;各第二滑车底部设有爬升钢索,各爬升钢索的底端与地面上的地锚拉结钢件固定连接,各地锚拉结钢件通过锚栓与地面固定连接;各爬升钢索上套设有环形的滑索,各滑索能在该爬升钢索上滑动;各滑索连接水平绳索,各水平绳索末端分别与固定在该施工平台两端的电动葫芦固定连接。
Construction platform and construction technology for stay cable sliding and horizontal cable displacement
一种斜索滑行与水平索位移的施工平台及施工工艺
LIU AIDONG (author)
2022-09-23
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Stay cable construction method and stay cable construction device
European Patent Office | 2021
|Bridge stay cable lagging tensioning construction technology
European Patent Office | 2022
|Stay cable construction method of extradosed cable-stayed bridge
European Patent Office | 2020
|