Construction method for structurally reinforcing and transforming sticky steel plate
The invention relates to the technical field of sticky steel plate lamination, in particular to a construction method for structural reinforcement and reconstruction of a sticky steel plate, which comprises the following steps: surface treatment, punching at four corners of a laminated object, proportioning glue, gluing the laminated object, laminating, fixing by bolts, detecting whether the lamination is successful, removing the glue, and coating an anticorrosive material. The surface treatment comprises binding surface cleaning and bound surface cleaning, the binding surface cleaning is mainly used for removing rust and grinding a curved surface, the bound surface cleaning is mainly used for grinding a rough surface and filling pits, the glue proportioning comprises proportioning according to a proportion, the proportioned glue can be heated to 40 DEG C according to the proportion, and a small amount of acetone is added for use. The glue is removed mainly through a knife or a grinding wheel, after polishing is completed, acetone is used for slight wiping, mixed epoxy resin glue is heated, a small amount of acetone is added, molecules in the glue can be helped to move, and the glue is not affected by weather any more.
本发明涉及粘钢板贴合技术领域,更具体地涉及一种结构加固改造粘钢板的施工方法,包括表面处理,还包括贴合物四角打孔、配比胶水、贴合物涂胶、进行贴合、螺栓固定、检测是否贴合成功、清除胶水、涂防腐材料,表面处理包括清理贴合面和清理被贴合面,清理贴合面主要用除锈和曲面磨平,清理被贴合面主要用粗糙面磨平和坑洼补齐,配比胶水包括按照比例配比,按照比例配比可将配比好的胶水加热至40C°并添加少量丙酮使用,清除胶水主要通过小刀或者砂轮对其表面凝固的胶水进行清除,打磨完毕后通过丙酮轻擦,混合后的环氧树脂胶加热并加入少量的丙酮,能够帮助胶水内部分子进行运动,使其胶水不在受天气影响。
Construction method for structurally reinforcing and transforming sticky steel plate
The invention relates to the technical field of sticky steel plate lamination, in particular to a construction method for structural reinforcement and reconstruction of a sticky steel plate, which comprises the following steps: surface treatment, punching at four corners of a laminated object, proportioning glue, gluing the laminated object, laminating, fixing by bolts, detecting whether the lamination is successful, removing the glue, and coating an anticorrosive material. The surface treatment comprises binding surface cleaning and bound surface cleaning, the binding surface cleaning is mainly used for removing rust and grinding a curved surface, the bound surface cleaning is mainly used for grinding a rough surface and filling pits, the glue proportioning comprises proportioning according to a proportion, the proportioned glue can be heated to 40 DEG C according to the proportion, and a small amount of acetone is added for use. The glue is removed mainly through a knife or a grinding wheel, after polishing is completed, acetone is used for slight wiping, mixed epoxy resin glue is heated, a small amount of acetone is added, molecules in the glue can be helped to move, and the glue is not affected by weather any more.
本发明涉及粘钢板贴合技术领域,更具体地涉及一种结构加固改造粘钢板的施工方法,包括表面处理,还包括贴合物四角打孔、配比胶水、贴合物涂胶、进行贴合、螺栓固定、检测是否贴合成功、清除胶水、涂防腐材料,表面处理包括清理贴合面和清理被贴合面,清理贴合面主要用除锈和曲面磨平,清理被贴合面主要用粗糙面磨平和坑洼补齐,配比胶水包括按照比例配比,按照比例配比可将配比好的胶水加热至40C°并添加少量丙酮使用,清除胶水主要通过小刀或者砂轮对其表面凝固的胶水进行清除,打磨完毕后通过丙酮轻擦,混合后的环氧树脂胶加热并加入少量的丙酮,能够帮助胶水内部分子进行运动,使其胶水不在受天气影响。
Construction method for structurally reinforcing and transforming sticky steel plate
一种结构加固改造粘钢板的施工方法
CAI JIANPO (author)
2022-10-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction robot and construction method for reinforcing tunnel sticky steel
European Patent Office | 2020
|Construction method for reinforcing and reconstructing sticky steel plates of structure
European Patent Office | 2020
|European Patent Office | 2023
|Construction method for reinforcing and repairing concrete cover beam through sticky steel
European Patent Office | 2023
|