A platform for research: civil engineering, architecture and urbanism
The invention provides a connection form of a prefabricated stand column and a bearing platform and a construction method thereof, and is characterized in that the bearing platform is divided into a prefabricated part and a cast-in-place part, the prefabricated part is used as a pouring template of the cast-in-place part and comprises a prefabricated bearing platform side wall and a bottom plate, and a mortar leveling layer is arranged between the prefabricated bottom plate and a bottom cushion layer; the prefabricated stand columns and the prefabricated bearing platform bottom plate are supported through the supports, and finally the rest parts of the bearing platform are poured and connected into a whole. According to the connecting form and the construction method thereof, the connecting structure of the prefabricated stand column and the bearing platform is simple, structural stress is safe and reliable, the requirement for prefabrication and pre-burying construction precision is low, construction is convenient, construction formworks can be saved, and the construction cost is reduced.
本发明提供了一种预制立柱与承台的连接形式及其施工方法,其特征在于,承台分为预制和现浇两部分,预制部分作为现浇部分的浇筑模板,包括预制承台侧壁和底板,预制底板与底部垫层之间设置砂浆调平层,预制立柱和预制承台底板之间先用支架支撑,最后浇筑承台剩余部分连接形成整体。本发明的连接形式及其施工方法使得预制立柱与承台连接构造简单、结构受力安全可靠、预制与预埋施工精度要求较低、施工方便、可节省施工模板、降低工程造价。
The invention provides a connection form of a prefabricated stand column and a bearing platform and a construction method thereof, and is characterized in that the bearing platform is divided into a prefabricated part and a cast-in-place part, the prefabricated part is used as a pouring template of the cast-in-place part and comprises a prefabricated bearing platform side wall and a bottom plate, and a mortar leveling layer is arranged between the prefabricated bottom plate and a bottom cushion layer; the prefabricated stand columns and the prefabricated bearing platform bottom plate are supported through the supports, and finally the rest parts of the bearing platform are poured and connected into a whole. According to the connecting form and the construction method thereof, the connecting structure of the prefabricated stand column and the bearing platform is simple, structural stress is safe and reliable, the requirement for prefabrication and pre-burying construction precision is low, construction is convenient, construction formworks can be saved, and the construction cost is reduced.
本发明提供了一种预制立柱与承台的连接形式及其施工方法,其特征在于,承台分为预制和现浇两部分,预制部分作为现浇部分的浇筑模板,包括预制承台侧壁和底板,预制底板与底部垫层之间设置砂浆调平层,预制立柱和预制承台底板之间先用支架支撑,最后浇筑承台剩余部分连接形成整体。本发明的连接形式及其施工方法使得预制立柱与承台连接构造简单、结构受力安全可靠、预制与预埋施工精度要求较低、施工方便、可节省施工模板、降低工程造价。
Connecting form of prefabricated stand column and bearing platform and construction method of connecting form
一种预制立柱与承台的连接形式及其施工方法
2022-11-04
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Connecting method for prefabricated stand column and bearing platform
European Patent Office | 2023
|Prefabricated pile and prefabricated column connecting bearing platform construction method
European Patent Office | 2021
|European Patent Office | 2023
|European Patent Office | 2021
|European Patent Office | 2024
|