A platform for research: civil engineering, architecture and urbanism
Connecting structure based on cast-in-place bearing platform and prefabricated stand column and construction method of connecting structure
The invention provides a connecting structure based on a cast-in-place bearing platform and a prefabricated stand column and a construction method thereof.According to the connecting mode of the prefabricated stand column and the bearing platform, the bearing platform is cast in place twice, firstly, a bottom plate with a certain thickness is poured, and the prefabricated stand column is sequentially installed and positioned and reinforced through a positioning support; and finally, second-time bearing platform concrete pouring construction is conducted, and the prefabricated stand columns and the bearing platform are connected into a whole. The connecting construction precision requirement of the prefabricated stand column and the bearing platform can be lowered, it is guaranteed that joint connection is safe and reliable, construction convenience is improved, and the engineering cost is lowered.
本发明提供了一种基于现浇承台与预制立柱的连接结构及其施工方法,本发明提供的预制立柱与承台的连接形式,承台分为两次现浇,首先浇筑一定厚度的底板,依次安装预制立柱并采用定位支架定位加固,最后进行第二次承台混凝土浇筑施工将预制立柱和承台连接为整体。本发明可以降低预制立柱与承台的连接施工精度要求,保证节点连接安全可靠,提高施工便利性,降低工程造价。
Connecting structure based on cast-in-place bearing platform and prefabricated stand column and construction method of connecting structure
The invention provides a connecting structure based on a cast-in-place bearing platform and a prefabricated stand column and a construction method thereof.According to the connecting mode of the prefabricated stand column and the bearing platform, the bearing platform is cast in place twice, firstly, a bottom plate with a certain thickness is poured, and the prefabricated stand column is sequentially installed and positioned and reinforced through a positioning support; and finally, second-time bearing platform concrete pouring construction is conducted, and the prefabricated stand columns and the bearing platform are connected into a whole. The connecting construction precision requirement of the prefabricated stand column and the bearing platform can be lowered, it is guaranteed that joint connection is safe and reliable, construction convenience is improved, and the engineering cost is lowered.
本发明提供了一种基于现浇承台与预制立柱的连接结构及其施工方法,本发明提供的预制立柱与承台的连接形式,承台分为两次现浇,首先浇筑一定厚度的底板,依次安装预制立柱并采用定位支架定位加固,最后进行第二次承台混凝土浇筑施工将预制立柱和承台连接为整体。本发明可以降低预制立柱与承台的连接施工精度要求,保证节点连接安全可靠,提高施工便利性,降低工程造价。
Connecting structure based on cast-in-place bearing platform and prefabricated stand column and construction method of connecting structure
基于现浇承台与预制立柱的连接结构及其施工方法
SONG SEUNG-ROK (author) / XUE YUN (author) / YU LEI (author) / DAI BIN (author) / LI SHAOBO (author) / LI JIAN (author) / SHENG XIAOCHENG (author) / WANG HAO (author) / ZOU ZHIQIANG (author)
2024-05-28
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Connecting method for prefabricated stand column and bearing platform
European Patent Office | 2023
|European Patent Office | 2022
|Prefabricated pile and prefabricated column connecting bearing platform construction method
European Patent Office | 2021
|Prefabricated pier column and bearing platform connecting structure and construction method
European Patent Office | 2020
|