Large-scale cutter suction dredger blowing loading barge and stern blowing loading rake combined construction process
The invention relates to a large cutter suction dredger blowing loading barge and stern blowing loading rake combined construction technology. Comprising the following steps that S1, preparation work before construction is conducted; s2, the cutter suction dredger is connected with an upper water self-floating pipeline for stern blowing; s3, connecting a bow-blowing large head of the trailing suction dredger with an overwater self-floating pipeline; s4, the cutter suction dredger blows a barge to the stern of the trailing suction dredger; s5, the drag suction dredger breaks pipeline connection, sails to a destination for mud throwing under heavy load and sails back to a pipe opening under light load; s6, the mud barge leans towards the side of the cutter suction dredger; s7, the cutter suction dredger switches the stern blowing mode to the blowing mode; s8, the cutter suction dredger blows the mud loading barge; s9, the mud barge leaves the cutter suction dredger, sails to a destination in a heavy load mode to throw mud and sails back to the cutter suction dredger in a light load mode; and S10, the blowing mode of the cutter suction dredger is switched to the stern blowing mode, and the steps from S3 to S9 are repeated. By means of the construction technology, the time for stopping and waiting for barge of the cutter suction dredger is shortened, and the production capacity of the cutter suction dredger is improved.
本发明涉及一种大型绞吸船艕吹装驳与艉吹装耙相结合施工工艺。包括以下步骤,S1、进行施工前的准备工作;S2、绞吸挖泥船连接艉吹用水上自浮管线;S3、耙吸挖泥船的艏吹大头与水上自浮管线连接;S4、绞吸挖泥船向耙吸挖泥船艉吹装驳;S5、耙吸挖泥船断开管线连接,重载航行至目的地抛泥并轻载航行回到管口位置;S6、泥驳船向绞吸挖泥船侧方靠驳;S7、绞吸挖泥船切换艉吹模式至艕吹模式;S8、绞吸挖泥船艕吹装载泥驳船;S9、泥驳离开绞吸挖泥船,重载航行至目的地抛泥并轻载航行回靠绞吸挖泥船;S10、绞吸挖泥船切换艕吹模式至艉吹模式,重复步骤S3至S9。本发明的施工工艺减少了绞吸挖泥船停工待驳的时间,提升了绞吸挖泥船的生产能力。
Large-scale cutter suction dredger blowing loading barge and stern blowing loading rake combined construction process
The invention relates to a large cutter suction dredger blowing loading barge and stern blowing loading rake combined construction technology. Comprising the following steps that S1, preparation work before construction is conducted; s2, the cutter suction dredger is connected with an upper water self-floating pipeline for stern blowing; s3, connecting a bow-blowing large head of the trailing suction dredger with an overwater self-floating pipeline; s4, the cutter suction dredger blows a barge to the stern of the trailing suction dredger; s5, the drag suction dredger breaks pipeline connection, sails to a destination for mud throwing under heavy load and sails back to a pipe opening under light load; s6, the mud barge leans towards the side of the cutter suction dredger; s7, the cutter suction dredger switches the stern blowing mode to the blowing mode; s8, the cutter suction dredger blows the mud loading barge; s9, the mud barge leaves the cutter suction dredger, sails to a destination in a heavy load mode to throw mud and sails back to the cutter suction dredger in a light load mode; and S10, the blowing mode of the cutter suction dredger is switched to the stern blowing mode, and the steps from S3 to S9 are repeated. By means of the construction technology, the time for stopping and waiting for barge of the cutter suction dredger is shortened, and the production capacity of the cutter suction dredger is improved.
本发明涉及一种大型绞吸船艕吹装驳与艉吹装耙相结合施工工艺。包括以下步骤,S1、进行施工前的准备工作;S2、绞吸挖泥船连接艉吹用水上自浮管线;S3、耙吸挖泥船的艏吹大头与水上自浮管线连接;S4、绞吸挖泥船向耙吸挖泥船艉吹装驳;S5、耙吸挖泥船断开管线连接,重载航行至目的地抛泥并轻载航行回到管口位置;S6、泥驳船向绞吸挖泥船侧方靠驳;S7、绞吸挖泥船切换艉吹模式至艕吹模式;S8、绞吸挖泥船艕吹装载泥驳船;S9、泥驳离开绞吸挖泥船,重载航行至目的地抛泥并轻载航行回靠绞吸挖泥船;S10、绞吸挖泥船切换艕吹模式至艉吹模式,重复步骤S3至S9。本发明的施工工艺减少了绞吸挖泥船停工待驳的时间,提升了绞吸挖泥船的生产能力。
Large-scale cutter suction dredger blowing loading barge and stern blowing loading rake combined construction process
一种大型绞吸船艕吹装驳与艉吹装耙相结合施工工艺
LI MINGYANG (author) / TONG DECAI (author) / ZHOU ZHIQIANG (author) / ZHANG YI (author) / YANG QIAOLIANG (author) / WANG CHUNMIN (author) / WANG DONG (author) / LI LEILEI (author) / GAO JIANWEI (author) / ZOU BING (author)
2022-11-08
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
Connecting device for stern blowing pipeline of cutter suction dredger
European Patent Office | 2023
|Large cutter suction dredger barge loading system and debugging method
European Patent Office | 2021
|European Patent Office | 2024
|European Patent Office | 2024
|Screening and loading platform for dredger fill of cutter suction dredger
European Patent Office | 2024
|