A platform for research: civil engineering, architecture and urbanism
Cable-tower-free double-cable crane system and construction method
The invention relates to a cable-tower-free double-cable crane system and a construction method, and the cable-tower-free double-cable crane system comprises a main cable crane system which comprises a main cable crossing over a canyon and main cable anchors which are located at the two ends of the main cable and anchor the main cable on mountains on the two sides of the canyon, a main cable crown block moving in the length direction of the main cable rope is erected on the main cable rope. The auxiliary cable rope crane system is located above the main cable rope crane system and comprises an auxiliary cable rope crossing the upper portion of the canyon and auxiliary cable anchors located at the two ends of the auxiliary cable rope and used for anchoring the auxiliary cable rope to mountain bodies on the two sides of the canyon, and an auxiliary cable crown block moving in the length direction of the auxiliary cable rope is erected on the auxiliary cable rope. The auxiliary cable rope crane system is arranged above the main cable rope crane system and used for hoisting part of the structure of the main cable rope crane system. And the hoisting and hoisting range of the auxiliary cable rope crane system can meet the construction of the main cable rope crane system, so that the auxiliary cable rope crane system can replace the construction of sidewalks with complicated construction, and has higher economical efficiency.
本申请涉及一种无缆塔双缆索吊系统及施工方法,包括:主缆缆索吊机系统,其包括横跨在峡谷上方的主缆缆索,以及位于主缆缆索的两端并将主缆缆索锚固在峡谷两侧山体上的主缆锚碇,主缆缆索上架设有沿主缆缆索长度方向移动的主缆天车;副缆缆索吊机系统,其位于主缆缆索吊机系统的上方,包括横跨在峡谷上方的副缆缆索,以及位于副缆缆索的两端将副缆缆索锚固在峡谷两侧山体上的副缆锚碇,副缆缆索上架设有沿副缆缆索长度方向移动的副缆天车。本申请在主缆缆索吊机系统上方设置副缆缆索吊机系统用于起重主缆缆索吊机系统的部分结构。副缆缆索吊机系统吊重及起重范围均可满足主缆缆索吊机系统的施工,可以取代施工复杂的便道修建,具有较高的经济性。
Cable-tower-free double-cable crane system and construction method
The invention relates to a cable-tower-free double-cable crane system and a construction method, and the cable-tower-free double-cable crane system comprises a main cable crane system which comprises a main cable crossing over a canyon and main cable anchors which are located at the two ends of the main cable and anchor the main cable on mountains on the two sides of the canyon, a main cable crown block moving in the length direction of the main cable rope is erected on the main cable rope. The auxiliary cable rope crane system is located above the main cable rope crane system and comprises an auxiliary cable rope crossing the upper portion of the canyon and auxiliary cable anchors located at the two ends of the auxiliary cable rope and used for anchoring the auxiliary cable rope to mountain bodies on the two sides of the canyon, and an auxiliary cable crown block moving in the length direction of the auxiliary cable rope is erected on the auxiliary cable rope. The auxiliary cable rope crane system is arranged above the main cable rope crane system and used for hoisting part of the structure of the main cable rope crane system. And the hoisting and hoisting range of the auxiliary cable rope crane system can meet the construction of the main cable rope crane system, so that the auxiliary cable rope crane system can replace the construction of sidewalks with complicated construction, and has higher economical efficiency.
本申请涉及一种无缆塔双缆索吊系统及施工方法,包括:主缆缆索吊机系统,其包括横跨在峡谷上方的主缆缆索,以及位于主缆缆索的两端并将主缆缆索锚固在峡谷两侧山体上的主缆锚碇,主缆缆索上架设有沿主缆缆索长度方向移动的主缆天车;副缆缆索吊机系统,其位于主缆缆索吊机系统的上方,包括横跨在峡谷上方的副缆缆索,以及位于副缆缆索的两端将副缆缆索锚固在峡谷两侧山体上的副缆锚碇,副缆缆索上架设有沿副缆缆索长度方向移动的副缆天车。本申请在主缆缆索吊机系统上方设置副缆缆索吊机系统用于起重主缆缆索吊机系统的部分结构。副缆缆索吊机系统吊重及起重范围均可满足主缆缆索吊机系统的施工,可以取代施工复杂的便道修建,具有较高的经济性。
Cable-tower-free double-cable crane system and construction method
一种无缆塔双缆索吊系统及施工方法
ZHOU GONGJIAN (author) / MAO WEIQI (author) / ZANG CHAO (author) / TU MANMING (author) / LIN MINGWEI (author) / LIANG WEI (author) / ZHENG BING (author) / LIU CUIYUN (author) / LI PENG (author) / XU QILI (author)
2022-11-22
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Hanging and buckling combined cable crane tower construction method
European Patent Office | 2024
|Large-span railway suspension bridge cable crane main tower cable saddle construction method
European Patent Office | 2023
|Double-tower-column cable bent tower construction method
European Patent Office | 2023
|