A platform for research: civil engineering, architecture and urbanism
Steel pipe pile guiding device and using method
The invention relates to a steel pipe pile guiding device and a using method, and relates to the technical field of bridge construction, the steel pipe pile guiding device comprises at least two sets of guiding units and a connecting system, the at least two sets of guiding units are arranged in the vertical direction, and each guiding unit comprises a fixing hoop, an adjusting hoop, a connecting rod and an adjusting mechanism; the two ends of the connecting rod are connected with the fixing hoop and the adjusting hoop correspondingly, and the adjusting mechanism is arranged on the adjusting hoop in a penetrating mode and used for pushing a to-be-adjusted steel pipe pile located in the adjusting hoop in the radial direction of the adjusting hoop. The adjusting mechanism adopts a bolt, and the bolt penetrates through the adjusting hoop and is in threaded connection with the adjusting hoop, so that the problems that in the steel pipe pile inserting and driving process in the related technology, when the water flow speed of a water area is high, positioning of the steel pipe pile is difficult, and the construction efficiency is high are solved. And the plane position and perpendicularity of the steel pipe pile can be directly influenced by inserting and driving the steel pipe pile under the condition of high flow velocity.
本申请涉及一种钢管桩导向装置和使用方法,涉及桥梁施工技术领域,该钢管桩导向装置包括至少两组导向单元和连接系,至少两组导向单元沿竖直方向布置,其包括固定抱箍、调节抱箍、连接杆和调节机构,所述连接杆的两端分别连接固定抱箍和调节抱箍,所述调节机构穿设于调节抱箍上,并用于沿调节抱箍的径向顶推位于调节抱箍中的待调节钢管桩;连接系连接相邻的两个连接杆,调节机构采用螺栓,螺栓穿过调节抱箍并与调节抱箍螺纹连接,以解决相关技术中在进行钢管桩插打过程中,当水域的水流流速快时,钢管桩的定位较为艰难,在高流速的情况下插打钢管桩会直接影响钢管桩的平面位置及垂直度的问题。
Steel pipe pile guiding device and using method
The invention relates to a steel pipe pile guiding device and a using method, and relates to the technical field of bridge construction, the steel pipe pile guiding device comprises at least two sets of guiding units and a connecting system, the at least two sets of guiding units are arranged in the vertical direction, and each guiding unit comprises a fixing hoop, an adjusting hoop, a connecting rod and an adjusting mechanism; the two ends of the connecting rod are connected with the fixing hoop and the adjusting hoop correspondingly, and the adjusting mechanism is arranged on the adjusting hoop in a penetrating mode and used for pushing a to-be-adjusted steel pipe pile located in the adjusting hoop in the radial direction of the adjusting hoop. The adjusting mechanism adopts a bolt, and the bolt penetrates through the adjusting hoop and is in threaded connection with the adjusting hoop, so that the problems that in the steel pipe pile inserting and driving process in the related technology, when the water flow speed of a water area is high, positioning of the steel pipe pile is difficult, and the construction efficiency is high are solved. And the plane position and perpendicularity of the steel pipe pile can be directly influenced by inserting and driving the steel pipe pile under the condition of high flow velocity.
本申请涉及一种钢管桩导向装置和使用方法,涉及桥梁施工技术领域,该钢管桩导向装置包括至少两组导向单元和连接系,至少两组导向单元沿竖直方向布置,其包括固定抱箍、调节抱箍、连接杆和调节机构,所述连接杆的两端分别连接固定抱箍和调节抱箍,所述调节机构穿设于调节抱箍上,并用于沿调节抱箍的径向顶推位于调节抱箍中的待调节钢管桩;连接系连接相邻的两个连接杆,调节机构采用螺栓,螺栓穿过调节抱箍并与调节抱箍螺纹连接,以解决相关技术中在进行钢管桩插打过程中,当水域的水流流速快时,钢管桩的定位较为艰难,在高流速的情况下插打钢管桩会直接影响钢管桩的平面位置及垂直度的问题。
Steel pipe pile guiding device and using method
一种钢管桩导向装置和使用方法
MING HONGBING (author) / ZUO SHAOHUA (author) / WANG CHENG (author) / LIU TIANCHU (author) / ZHANG KUN (author) / CHEN ZONGHUI (author) / WANG YINFENG (author) / PENG CONG (author) / LI XU (author) / CAI YUELONG (author)
2022-11-25
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Rock-socketed steel pipe pile construction guiding device
European Patent Office | 2024
|Deepwater platform steel pipe pile positioning and guiding device
European Patent Office | 2023
|