A platform for research: civil engineering, architecture and urbanism
Quick replacement method for shock insulation support
The invention discloses a quick replacement method for a shock insulation support. The quick replacement method comprises the following steps: (1) manufacturing a clamp tool; (2) corbel manufacturing; (3) mounting a clamp tool and a bracket and constructing a jacking platform; (4) a jack is installed, and a jacking system is debugged; (5) the jack is jacked, and the old support is taken out; (6) placing a new support in place; (7) the jack is unloaded, and the clamp tool is dismantled; and (8) connecting bolts are installed and fastened, and replacement is completed. The problem of replacement of a conventional rubber shock insulation support is solved, and particularly, the problem of replacement of a support with a smaller size into a support with a larger size is solved.
本发明公开了一种隔震支座的快速更换方法,包括如下步骤:(1)夹具工装制作;(2)牛腿制作;(3)夹具工装和牛腿的安装及顶升平台构建;(4)千斤顶安装、顶升系统调试;(5)千斤顶顶升、旧支座取出;(6)新支座就位;(7)千斤顶卸载、夹具工装拆除;(8)连接螺栓安装、紧固,更换完成。本发明解决了常规橡胶隔震支座的更换问题,尤其是较小尺寸的支座更换为较大尺寸支座的问题。
Quick replacement method for shock insulation support
The invention discloses a quick replacement method for a shock insulation support. The quick replacement method comprises the following steps: (1) manufacturing a clamp tool; (2) corbel manufacturing; (3) mounting a clamp tool and a bracket and constructing a jacking platform; (4) a jack is installed, and a jacking system is debugged; (5) the jack is jacked, and the old support is taken out; (6) placing a new support in place; (7) the jack is unloaded, and the clamp tool is dismantled; and (8) connecting bolts are installed and fastened, and replacement is completed. The problem of replacement of a conventional rubber shock insulation support is solved, and particularly, the problem of replacement of a support with a smaller size into a support with a larger size is solved.
本发明公开了一种隔震支座的快速更换方法,包括如下步骤:(1)夹具工装制作;(2)牛腿制作;(3)夹具工装和牛腿的安装及顶升平台构建;(4)千斤顶安装、顶升系统调试;(5)千斤顶顶升、旧支座取出;(6)新支座就位;(7)千斤顶卸载、夹具工装拆除;(8)连接螺栓安装、紧固,更换完成。本发明解决了常规橡胶隔震支座的更换问题,尤其是较小尺寸的支座更换为较大尺寸支座的问题。
Quick replacement method for shock insulation support
一种隔震支座的快速更换方法
SUN QINGJIE (author) / ZHAO PING (author) / LI HANCHONG (author) / MENG XIAOWEI (author) / YANG JUNBO (author) / YANG CHENXIANG (author) / WU ZHIFEI (author) / GAO HUI (author) / LU HANYIN (author) / ZHOU YE (author)
2022-11-29
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Quick mounting and replacing method for bridge shock insulation rubber support
European Patent Office | 2020
|Building shock insulation support and jacking-free replacement method thereof
European Patent Office | 2021
|Overall replacement system for original building shock-insulation support and construction method
European Patent Office | 2015
|