A platform for research: civil engineering, architecture and urbanism
Formwork hanging structure system for nuclear power reactor cabin top plate and construction method of formwork hanging structure system
The invention relates to a suspended formwork structure system for a nuclear power reactor cabin top plate and a construction method of the suspended formwork structure system, relates to the technical field of nuclear power engineering structure construction, and aims to solve the problem that no space is provided for erecting a formwork supporting system on the ground in a nuclear power reactor cabin. The upper partition suspended beam system comprises a plurality of first supporting rods erected on the top of the side wall of the nuclear power reactor cabin and a plurality of second supporting rods erected on the first supporting rods. The middle separating and hanging beam system comprises a supporting platform, a plurality of hanging rods are installed between the supporting platform and the second supporting rods, a formwork is arranged on the supporting platform, and a pouring cavity is defined by the formwork and the side wall of the nuclear power reactor cabin; and the bottom operation protection system comprises a protection assembly and an operation platform, and a suspension assembly is arranged between the upper partition and suspension beam system and the operation platform. The construction method has the effect of facilitating construction of the nuclear power reactor cabin top concrete top plate.
本申请涉及一种用于核电堆舱顶板吊模结构体系及其施工方法,涉及核电工程结构施工技术领域,为了解决核电堆舱内地面上没有空间架设模板支撑体系的问题,其包括沿竖直方向依次设置的上部隔挂梁系统,上部隔挂梁系统包括搭设于核电堆舱侧墙顶部的若干第一支撑杆,及搭设在若干第一支撑杆上的若干第二支撑杆;中部隔挂梁系统,中部隔挂梁系统包括支撑平台,支撑平台和第二支撑杆之间安装有若干吊杆,支撑平台上设置有模板,模板和所述核电堆舱侧墙围成浇筑腔;底部操作防护系统,底部操作防护系统包括防护组件和操作平台,上部隔挂梁系统和操作平台之间设置有悬吊组件。本申请具有便于进行核电堆舱顶部混凝土顶板施工的效果。
Formwork hanging structure system for nuclear power reactor cabin top plate and construction method of formwork hanging structure system
The invention relates to a suspended formwork structure system for a nuclear power reactor cabin top plate and a construction method of the suspended formwork structure system, relates to the technical field of nuclear power engineering structure construction, and aims to solve the problem that no space is provided for erecting a formwork supporting system on the ground in a nuclear power reactor cabin. The upper partition suspended beam system comprises a plurality of first supporting rods erected on the top of the side wall of the nuclear power reactor cabin and a plurality of second supporting rods erected on the first supporting rods. The middle separating and hanging beam system comprises a supporting platform, a plurality of hanging rods are installed between the supporting platform and the second supporting rods, a formwork is arranged on the supporting platform, and a pouring cavity is defined by the formwork and the side wall of the nuclear power reactor cabin; and the bottom operation protection system comprises a protection assembly and an operation platform, and a suspension assembly is arranged between the upper partition and suspension beam system and the operation platform. The construction method has the effect of facilitating construction of the nuclear power reactor cabin top concrete top plate.
本申请涉及一种用于核电堆舱顶板吊模结构体系及其施工方法,涉及核电工程结构施工技术领域,为了解决核电堆舱内地面上没有空间架设模板支撑体系的问题,其包括沿竖直方向依次设置的上部隔挂梁系统,上部隔挂梁系统包括搭设于核电堆舱侧墙顶部的若干第一支撑杆,及搭设在若干第一支撑杆上的若干第二支撑杆;中部隔挂梁系统,中部隔挂梁系统包括支撑平台,支撑平台和第二支撑杆之间安装有若干吊杆,支撑平台上设置有模板,模板和所述核电堆舱侧墙围成浇筑腔;底部操作防护系统,底部操作防护系统包括防护组件和操作平台,上部隔挂梁系统和操作平台之间设置有悬吊组件。本申请具有便于进行核电堆舱顶部混凝土顶板施工的效果。
Formwork hanging structure system for nuclear power reactor cabin top plate and construction method of formwork hanging structure system
一种用于核电堆舱顶板吊模结构体系及其施工方法
WU GUANGYU (author) / ZHU RONGJUN (author) / ZHENG GUANYU (author) / SUN JIAN (author) / XUE ZHIYAO (author) / SUN YUJIE (author) / TANG HUAGANG (author) / MEI YINGBAO (author) / YOU XUECHUN (author)
2022-12-02
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Roof formwork erecting construction method and formwork hanging system
European Patent Office | 2024
|Aqueduct formwork construction hanging basket with balance structure
European Patent Office | 2024
|