A platform for research: civil engineering, architecture and urbanism
Coal gangue sintered brick and production process thereof
The invention discloses a coal gangue sintered brick production process, which comprises: S1, crushing a coal gangue raw material through a crusher, placing the crushed raw material into a stirrer, and adding water to stir; s2, conveying the stirred raw materials to an aging warehouse for aging; s3, the aged raw materials are input into an extruder for extrusion molding, and then a blank is formed through cutting; s4, the blank bodies are stacked in a kiln to be dried, the blank bodies are turned over through a turnover device, and then the drying speed of the blank bodies is increased; a turning device in the step S4 comprises a supporting frame 1, a fixing mechanism 2 and a turning mechanism 3, and the fixing mechanism 2 and the turning mechanism 3 are both arranged on the supporting frame 1. The device is convenient and fast to use, green bodies of the coal gangue sintered bricks can be turned over fast, and the drying speed of the coal gangue sintered bricks can be increased conveniently.
本发明公开了一种煤矸石烧结砖的生产工艺,包括如下步骤:S1、通过破碎机对煤矸石原料进行破碎,然后把破碎的原料放入搅拌机加水搅拌;S2、把搅拌好的原料输送到陈化库进行陈化;S3、把陈化完的原料输入挤出机挤出成型,然后通过切割形成胚体;S4、把胚体码放在窑中烘干,通过翻转装置翻动胚体,进而提高胚体的烘干速度;步骤S4中的翻动装置,包括支撑架1、固定机构2和翻转机构3,固定机构2和翻转机构3均设置在支撑架1上。本发明使用方便快捷,可实现快速翻转煤矸石烧结砖的胚体,便于加快煤矸石烧结砖的烘干速度。
Coal gangue sintered brick and production process thereof
The invention discloses a coal gangue sintered brick production process, which comprises: S1, crushing a coal gangue raw material through a crusher, placing the crushed raw material into a stirrer, and adding water to stir; s2, conveying the stirred raw materials to an aging warehouse for aging; s3, the aged raw materials are input into an extruder for extrusion molding, and then a blank is formed through cutting; s4, the blank bodies are stacked in a kiln to be dried, the blank bodies are turned over through a turnover device, and then the drying speed of the blank bodies is increased; a turning device in the step S4 comprises a supporting frame 1, a fixing mechanism 2 and a turning mechanism 3, and the fixing mechanism 2 and the turning mechanism 3 are both arranged on the supporting frame 1. The device is convenient and fast to use, green bodies of the coal gangue sintered bricks can be turned over fast, and the drying speed of the coal gangue sintered bricks can be increased conveniently.
本发明公开了一种煤矸石烧结砖的生产工艺,包括如下步骤:S1、通过破碎机对煤矸石原料进行破碎,然后把破碎的原料放入搅拌机加水搅拌;S2、把搅拌好的原料输送到陈化库进行陈化;S3、把陈化完的原料输入挤出机挤出成型,然后通过切割形成胚体;S4、把胚体码放在窑中烘干,通过翻转装置翻动胚体,进而提高胚体的烘干速度;步骤S4中的翻动装置,包括支撑架1、固定机构2和翻转机构3,固定机构2和翻转机构3均设置在支撑架1上。本发明使用方便快捷,可实现快速翻转煤矸石烧结砖的胚体,便于加快煤矸石烧结砖的烘干速度。
Coal gangue sintered brick and production process thereof
一种煤矸石烧结砖及其生产工艺
NIE PENGREN (author) / NIE XIANGMING (author) / NIE XIANGBAO (author) / NIE DEGONG (author)
2022-12-09
Patent
Electronic Resource
Chinese
Coal gangue sintered brick and production process thereof
European Patent Office | 2020
|Coal gangue sintered brick and production method thereof
European Patent Office | 2015
|