Prefabricated cement component mounting process
The invention discloses a cement prefabricated part mounting process, and relates to the technical field of prefabricated part mounting processes, the cement prefabricated part mounting process comprises the following steps: mounting a steel corbel; assembling the precast beams; mounting the prefabricated columns; mounting a precast beam; prefabricated beam and slab integrated units are installed; mounting the prefabricated laminated slab; and mounting the prefabricated staircase. According to the cement prefabricated part installation technology, the steel corbels and the prefabricated beams are arranged to replace traditional manual on-site rebar binding and concrete pouring operation, part of manpower input in construction is reduced, the construction period is shortened, and the construction efficiency is improved by arranging the steel corbels and the prefabricated beams. The formwork-free and fixed-support-free installation mode is adopted, use of battens, formworks, pipes and other raw materials on the construction site is greatly reduced, noise and air pollution can be effectively reduced, green construction benefits are increased, deviation correction can be conducted on the deviated precast beam, operation is easy, efficiency is high, and equipment can be detached and repeatedly used.
本发明公开了一种水泥预制构件安装工艺,涉及预制构件安装工艺技术领域,所述水泥预制构件安装工艺包括如下步骤:钢牛腿安装;预制梁组装;预制柱安装;预制梁安装;预制梁板一体化单元安装;预制叠合板安装;预制楼梯安装。本发明所述的一种水泥预制构件安装工艺,通过设置钢牛腿和预制梁代替传统的人工现场进行钢筋绑扎、混凝土浇筑操作,减少了施工中部分人力投入,缩短了工期,设置钢牛腿和预制梁,采用免模板免固定支撑安装方式大大减少了施工现场木方、模板、管等原材的使用,可有效降低噪声与空气污染的产生,增加了绿色施工效益,可实现对偏移的预制梁进行纠偏,操作较为简单,效率较高,设备可拆卸反复使用。
Prefabricated cement component mounting process
The invention discloses a cement prefabricated part mounting process, and relates to the technical field of prefabricated part mounting processes, the cement prefabricated part mounting process comprises the following steps: mounting a steel corbel; assembling the precast beams; mounting the prefabricated columns; mounting a precast beam; prefabricated beam and slab integrated units are installed; mounting the prefabricated laminated slab; and mounting the prefabricated staircase. According to the cement prefabricated part installation technology, the steel corbels and the prefabricated beams are arranged to replace traditional manual on-site rebar binding and concrete pouring operation, part of manpower input in construction is reduced, the construction period is shortened, and the construction efficiency is improved by arranging the steel corbels and the prefabricated beams. The formwork-free and fixed-support-free installation mode is adopted, use of battens, formworks, pipes and other raw materials on the construction site is greatly reduced, noise and air pollution can be effectively reduced, green construction benefits are increased, deviation correction can be conducted on the deviated precast beam, operation is easy, efficiency is high, and equipment can be detached and repeatedly used.
本发明公开了一种水泥预制构件安装工艺,涉及预制构件安装工艺技术领域,所述水泥预制构件安装工艺包括如下步骤:钢牛腿安装;预制梁组装;预制柱安装;预制梁安装;预制梁板一体化单元安装;预制叠合板安装;预制楼梯安装。本发明所述的一种水泥预制构件安装工艺,通过设置钢牛腿和预制梁代替传统的人工现场进行钢筋绑扎、混凝土浇筑操作,减少了施工中部分人力投入,缩短了工期,设置钢牛腿和预制梁,采用免模板免固定支撑安装方式大大减少了施工现场木方、模板、管等原材的使用,可有效降低噪声与空气污染的产生,增加了绿色施工效益,可实现对偏移的预制梁进行纠偏,操作较为简单,效率较高,设备可拆卸反复使用。
Prefabricated cement component mounting process
一种水泥预制构件安装工艺
YAO XIAOMING (author) / LIU SHULIN (author) / NI SHIWU (author) / SHI WEIMING (author)
2022-12-23
Patent
Electronic Resource
Chinese
Cement prefabricated part mounting and positioning device
European Patent Office | 2022
|Prefabricated mounting component for fabricated wall tiles
European Patent Office | 2022
|European Patent Office | 2022
|