A platform for research: civil engineering, architecture and urbanism
Deviation correction method for local settlement of pile foundation building
The invention discloses a deviation rectifying method for local settlement of a pile foundation building, which comprises the following steps: S1, excavation of a foundation groove, S2, installation of a supporting device, S3, pouring of the foundation groove, and S4, stabilization of an original pile, the supporting device used in the deviation rectifying method comprises an installation base fixedly connected to the upper end of a first cement base, a first supporting pile and a second supporting pile are fixedly connected to the upper end of the mounting base, and a first jack is mounted at the upper end of the first supporting pile. The foundation groove and the maintenance groove are formed, the supporting device for effectively supporting the building can be additionally arranged near the original pile, the original pile is reinforced again in a matched mode, the original pile can be utilized, and therefore the correction effect of the building is improved.
本发明公开了桩基础建筑物局部沉降的纠偏方法,包括以下步骤:S1、开挖地基槽,S2、安装支撑装置,S3、浇注地基槽,S4、稳固原桩,上述纠偏方法中所使用到的支撑装置包括固定连接在第一水泥基座上端的安装底座,所述安装底座上端固定连接有第一支撑桩与第二支撑桩,所述第一支撑桩上端安装有第一千斤顶。本发明设置了地基槽与维修槽,可以在原桩附近先增设对建筑物进行有效支撑的支撑装置,配合对原桩进行重新加固,使得原桩可以得到利用,从而提高建筑物的纠偏效果。
Deviation correction method for local settlement of pile foundation building
The invention discloses a deviation rectifying method for local settlement of a pile foundation building, which comprises the following steps: S1, excavation of a foundation groove, S2, installation of a supporting device, S3, pouring of the foundation groove, and S4, stabilization of an original pile, the supporting device used in the deviation rectifying method comprises an installation base fixedly connected to the upper end of a first cement base, a first supporting pile and a second supporting pile are fixedly connected to the upper end of the mounting base, and a first jack is mounted at the upper end of the first supporting pile. The foundation groove and the maintenance groove are formed, the supporting device for effectively supporting the building can be additionally arranged near the original pile, the original pile is reinforced again in a matched mode, the original pile can be utilized, and therefore the correction effect of the building is improved.
本发明公开了桩基础建筑物局部沉降的纠偏方法,包括以下步骤:S1、开挖地基槽,S2、安装支撑装置,S3、浇注地基槽,S4、稳固原桩,上述纠偏方法中所使用到的支撑装置包括固定连接在第一水泥基座上端的安装底座,所述安装底座上端固定连接有第一支撑桩与第二支撑桩,所述第一支撑桩上端安装有第一千斤顶。本发明设置了地基槽与维修槽,可以在原桩附近先增设对建筑物进行有效支撑的支撑装置,配合对原桩进行重新加固,使得原桩可以得到利用,从而提高建筑物的纠偏效果。
Deviation correction method for local settlement of pile foundation building
桩基础建筑物局部沉降的纠偏方法
SONG JIAYING (author) / CHEN HUAN (author) / GONG SHUAI (author) / ZHANG XIABIN (author) / ZHOU PINGER (author)
2022-12-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deviation prevention device for building pile foundation
European Patent Office | 2023
|Deviation prevention system for building pile foundation
European Patent Office | 2021
|Deviation prevention device for building pile foundation
European Patent Office | 2024
|Deviation prevention structure for building pile foundation
European Patent Office | 2024
|Deviation prevention device for building pile foundation
European Patent Office | 2023
|