A platform for research: civil engineering, architecture and urbanism
Curtain wall positioning and mounting equipment
The invention discloses curtain wall positioning and mounting equipment, which belongs to the technical field of buildings and comprises two upright posts, and a plurality of cross beams are arranged in the two upright posts. According to the curtain wall, the cross beam is manually operated to be placed on the supporting limiting blocks, the curtain wall body is manually operated to enable the connecting rods at the four corners to firstly enter a second inner cavity formed in the cross beam, the connecting rods can drive the sliding blocks and the L-shaped sliding blocks to move when moving, and the curtain wall body and the curtain wall outer frame are sealed, clamped and fixed; meanwhile, the elastic force of a second spring can drive a spherical abutting block to enter an arc-shaped clamping groove formed in the cross beam, the using position of a connecting rod is preliminarily fixed, then the curtain wall body is rapidly positioned and installed, the correction and installation time of the curtain wall body is shortened, the use of bolts is reduced, the installation time is shortened, and the installation efficiency is improved. And meanwhile, the situation that bolts are rusted after long-term use, and later maintenance and disassembly work of the curtain wall body is affected is prevented, and the construction period is effectively shortened.
本发明公开了一种幕墙定位安装设备,属于建筑技术领域,包括立柱,所述立柱设置有两个,两个立柱的内部设置有多个横梁。本发明中,手动操作横梁使其放置在支撑限位块上,手动操作幕墙本体使四角的连接杆先进入到横梁开设的第二内腔内,连接杆在移动时会带动滑动块和L型滑块移动,对幕墙本体和幕墙外框进行密封夹紧固定,同时第二弹簧的弹力作用会带动球形抵块进入到横梁开设的弧形卡槽内,对连接杆的使用位置进行初步固定,进而对幕墙本体快速进行定位安装,减少了幕墙本体的校正安装时间,且减少了螺栓的使用,不仅减少了安装时间,且同时防止长期使用后螺栓产生锈蚀,对幕墙本体后期的维修拆卸工作造成影响,有效的缩短了施工周期。
Curtain wall positioning and mounting equipment
The invention discloses curtain wall positioning and mounting equipment, which belongs to the technical field of buildings and comprises two upright posts, and a plurality of cross beams are arranged in the two upright posts. According to the curtain wall, the cross beam is manually operated to be placed on the supporting limiting blocks, the curtain wall body is manually operated to enable the connecting rods at the four corners to firstly enter a second inner cavity formed in the cross beam, the connecting rods can drive the sliding blocks and the L-shaped sliding blocks to move when moving, and the curtain wall body and the curtain wall outer frame are sealed, clamped and fixed; meanwhile, the elastic force of a second spring can drive a spherical abutting block to enter an arc-shaped clamping groove formed in the cross beam, the using position of a connecting rod is preliminarily fixed, then the curtain wall body is rapidly positioned and installed, the correction and installation time of the curtain wall body is shortened, the use of bolts is reduced, the installation time is shortened, and the installation efficiency is improved. And meanwhile, the situation that bolts are rusted after long-term use, and later maintenance and disassembly work of the curtain wall body is affected is prevented, and the construction period is effectively shortened.
本发明公开了一种幕墙定位安装设备,属于建筑技术领域,包括立柱,所述立柱设置有两个,两个立柱的内部设置有多个横梁。本发明中,手动操作横梁使其放置在支撑限位块上,手动操作幕墙本体使四角的连接杆先进入到横梁开设的第二内腔内,连接杆在移动时会带动滑动块和L型滑块移动,对幕墙本体和幕墙外框进行密封夹紧固定,同时第二弹簧的弹力作用会带动球形抵块进入到横梁开设的弧形卡槽内,对连接杆的使用位置进行初步固定,进而对幕墙本体快速进行定位安装,减少了幕墙本体的校正安装时间,且减少了螺栓的使用,不仅减少了安装时间,且同时防止长期使用后螺栓产生锈蚀,对幕墙本体后期的维修拆卸工作造成影响,有效的缩短了施工周期。
Curtain wall positioning and mounting equipment
一种幕墙定位安装设备
GUO TAOHUI (author)
2022-12-30
Patent
Electronic Resource
Chinese
Glass curtain wall mounting equipment and glass curtain mounting method
European Patent Office | 2015
|