Concrete wet connection swivel spherical hinge prefabricated bearing platform and construction method
The invention discloses a concrete wet connection swivel spherical hinge prefabricated assembly bearing platform which comprises an upper bearing platform, a lower bearing platform, an upper spherical hinge and a lower spherical hinge, the upper bearing platform is connected with the upper spherical hinge through a steel-concrete interface connecting piece, and the lower bearing platform is connected with the lower spherical hinge through a steel-concrete interface connecting piece; the upper spherical hinge and the upper bearing platform prefabricated concrete form an upper spherical hinge prefabricated component. The construction method comprises the following steps: (1) processing and manufacturing the spherical hinge; (2) manufacturing the prefabricated structures of the upper and lower spherical hinges; (3) constructing the lower bearing platform and installing the lower spherical hinge; (4) installing the upper spherical hinge and the prefabricated parts; the steel-concrete composite structure is reasonable in design and simple in structure, the concrete prefabricated part is used for connecting the spherical hinge and the bearing platform part, concrete outside the spherical hinge and the steel spherical hinge are connected into a whole, the problems that the concrete of the connecting part of the spherical hinge and the lower bearing platform is nonuniform in vibration and insufficient in connecting strength can be effectively solved, the integrity of the steel-concrete composite structure is fully guaranteed, and the service life of the steel-concrete composite structure is prolonged. And development and popularization of the swivel construction method are facilitated.
本发明公开了一种混凝土湿接连接的转体球铰预制装配承台,包括上承台、下承台、上球铰、下球铰,上承台与上球铰通过钢混界面连接件连接,下承台与下球铰通过钢混界面连接件连接;上球铰和上承台预制混凝土形成上球铰预制构件。施工方法包括以下步骤:①球铰加工与制作,②上、下球铰预制构造制作,③下承台施工及下球铰安装,④上球铰及预制构件安装,⑤上承台施工,⑥桥墩施工。本发明设计合理,构造简单,运用混凝土预制构件连接球铰及承台部分,使得球铰外部混凝土与钢球铰连成整体,可有效避免球铰与下承台连接部分混凝土振捣不均匀,连接强度不够的问题,充分保证了钢混组合结构的整体性,有利于转体施工方法的发展与推广。
Concrete wet connection swivel spherical hinge prefabricated bearing platform and construction method
The invention discloses a concrete wet connection swivel spherical hinge prefabricated assembly bearing platform which comprises an upper bearing platform, a lower bearing platform, an upper spherical hinge and a lower spherical hinge, the upper bearing platform is connected with the upper spherical hinge through a steel-concrete interface connecting piece, and the lower bearing platform is connected with the lower spherical hinge through a steel-concrete interface connecting piece; the upper spherical hinge and the upper bearing platform prefabricated concrete form an upper spherical hinge prefabricated component. The construction method comprises the following steps: (1) processing and manufacturing the spherical hinge; (2) manufacturing the prefabricated structures of the upper and lower spherical hinges; (3) constructing the lower bearing platform and installing the lower spherical hinge; (4) installing the upper spherical hinge and the prefabricated parts; the steel-concrete composite structure is reasonable in design and simple in structure, the concrete prefabricated part is used for connecting the spherical hinge and the bearing platform part, concrete outside the spherical hinge and the steel spherical hinge are connected into a whole, the problems that the concrete of the connecting part of the spherical hinge and the lower bearing platform is nonuniform in vibration and insufficient in connecting strength can be effectively solved, the integrity of the steel-concrete composite structure is fully guaranteed, and the service life of the steel-concrete composite structure is prolonged. And development and popularization of the swivel construction method are facilitated.
本发明公开了一种混凝土湿接连接的转体球铰预制装配承台,包括上承台、下承台、上球铰、下球铰,上承台与上球铰通过钢混界面连接件连接,下承台与下球铰通过钢混界面连接件连接;上球铰和上承台预制混凝土形成上球铰预制构件。施工方法包括以下步骤:①球铰加工与制作,②上、下球铰预制构造制作,③下承台施工及下球铰安装,④上球铰及预制构件安装,⑤上承台施工,⑥桥墩施工。本发明设计合理,构造简单,运用混凝土预制构件连接球铰及承台部分,使得球铰外部混凝土与钢球铰连成整体,可有效避免球铰与下承台连接部分混凝土振捣不均匀,连接强度不够的问题,充分保证了钢混组合结构的整体性,有利于转体施工方法的发展与推广。
Concrete wet connection swivel spherical hinge prefabricated bearing platform and construction method
一种混凝土湿接连接的转体球铰预制装配承台及施工方法
WEI JIANGANG (author) / ZHAN GANGYI (author) / FAN JUNLIN (author) / ZHAO QIU (author) / FAN CUNZHI (author) / YANG HONGJIAN (author) / HUANGFU JUAN (author) / HUANG LIANG (author) / ZHANG XINYU (author) / HU CONG (author)
2023-01-06
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2023
|Swivel spherical hinge steel skeleton for bridge swivel construction
European Patent Office | 2023
|Swivel spherical hinge steel skeleton for bridge swivel construction
European Patent Office | 2024
|