A platform for research: civil engineering, architecture and urbanism
Pipe jacking construction well water pumping device
The invention belongs to the field of construction wastewater extraction, and particularly relates to a pipe jacking construction well water extraction device which comprises a chassis, a protection frame is fixedly installed on the outer side of the chassis, a water suction pump is fixedly installed on the top face of the chassis, the output end of the water suction pump is fixedly connected with a conveying pipe, and hydraulic rods are fixedly installed at the four corners of the top face of the chassis. The bottom ends of the hydraulic rods penetrate to the bottom face of the chassis, drilling blocks are fixedly installed at the bottom ends of the hydraulic rods, the ends of the drilling blocks are arranged in a sharp corner mode, and through the arrangement of the four hydraulic rods, after the protection frame is fixed, the four hydraulic rods are started to extend downwards. The downwards-jacked hydraulic rod can be inserted into the soil body, meanwhile, the drilling block is arranged in a matched mode, the downward drilling process of the hydraulic rod can be assisted, and therefore the protection frame and the water suction pump can be stabilized, and the stable placement process of the water suction pump and the protection frame in the water suction process is guaranteed.
本发明属于施工废水抽取领域,具体的说是一种顶管施工井水抽取装置,包括底盘,所述底盘的外侧固定安装有保护框,所述底盘的顶面固定安装有抽水泵,所述抽水泵的输出端固定连接有传输管,所述底盘的顶面四角均固定安装有液压杆,所述液压杆的底端贯穿至底盘的底面,且液压杆的底端固定安装有钻块,所述钻块的端部呈尖角设置,通过四根液压杆的设置,在保护框固定后,启动四根液压杆向下延伸,由于顶管施工的地方土体一般都暴露在外,下顶的液压杆可以插入到土体中,同时配合钻块的设置,可以协助液压杆的下钻过程,从而可以稳住保护框和抽水泵,保证抽水过程中抽水泵和保护框的稳定放置过程。
Pipe jacking construction well water pumping device
The invention belongs to the field of construction wastewater extraction, and particularly relates to a pipe jacking construction well water extraction device which comprises a chassis, a protection frame is fixedly installed on the outer side of the chassis, a water suction pump is fixedly installed on the top face of the chassis, the output end of the water suction pump is fixedly connected with a conveying pipe, and hydraulic rods are fixedly installed at the four corners of the top face of the chassis. The bottom ends of the hydraulic rods penetrate to the bottom face of the chassis, drilling blocks are fixedly installed at the bottom ends of the hydraulic rods, the ends of the drilling blocks are arranged in a sharp corner mode, and through the arrangement of the four hydraulic rods, after the protection frame is fixed, the four hydraulic rods are started to extend downwards. The downwards-jacked hydraulic rod can be inserted into the soil body, meanwhile, the drilling block is arranged in a matched mode, the downward drilling process of the hydraulic rod can be assisted, and therefore the protection frame and the water suction pump can be stabilized, and the stable placement process of the water suction pump and the protection frame in the water suction process is guaranteed.
本发明属于施工废水抽取领域,具体的说是一种顶管施工井水抽取装置,包括底盘,所述底盘的外侧固定安装有保护框,所述底盘的顶面固定安装有抽水泵,所述抽水泵的输出端固定连接有传输管,所述底盘的顶面四角均固定安装有液压杆,所述液压杆的底端贯穿至底盘的底面,且液压杆的底端固定安装有钻块,所述钻块的端部呈尖角设置,通过四根液压杆的设置,在保护框固定后,启动四根液压杆向下延伸,由于顶管施工的地方土体一般都暴露在外,下顶的液压杆可以插入到土体中,同时配合钻块的设置,可以协助液压杆的下钻过程,从而可以稳住保护框和抽水泵,保证抽水过程中抽水泵和保护框的稳定放置过程。
Pipe jacking construction well water pumping device
一种顶管施工井水抽取装置
GUO YOU (author) / WANG DONGHUI (author) / WANG TAO (author) / SUN LIZHAO (author) / LI ZHI (author) / WANG YUHUAN (author) / CHEN CHENG (author) / ZHANG XIAOKANG (author) / YANG YONGJUN (author)
2023-01-10
Patent
Electronic Resource
Chinese
Pipe jacking device and pipe jacking construction process
European Patent Office | 2020
|European Patent Office | 2022
|