Grouted rubble construction process
The invention discloses a grouted rubble construction process which comprises the following steps: S1, before construction, setting out a construction site by a constructor, and confirming a construction position; s2, a foundation pit is excavated, after the position of the foundation pit is confirmed, the foundation pit is excavated manually in cooperation with a machine, and after the foundation pit is excavated, the foundation pit is inspected; s3, foundation manufacturing is conducted, specifically, mortar prepared in advance is poured into the foundation pit which is inspected to be qualified, and the foundation is formed after the mortar is solidified; s4, a wall is built, specifically, mortar is laid on the construction position through a sand laying device, and then stone is built on the mortar; and S5, every time a layer of stone is built, the mortar is laid on the construction position through a sand laying device, and then the stone is built on the mortar till stone building is completed. The construction method has the effects that the situation that mortar needs to be laid on the stones by more workers during stone stacking, so that more constructors are invested, and the construction efficiency is reduced is reduced.
本发明公开了一种浆砌石施工工艺,包括S1:施工前,由施工人员对施工现场进行放样,确认施工位置;S2:基坑开挖,确认好基坑位置后,采用人工配合机械开挖基坑,基坑开挖好后,对基坑进行检验;S3:地基制作,将提前准备好的砂浆倒入检验合格的基坑中,待砂浆凝固后形成地基;S4:砌筑墙体,通过铺砂装置将砂浆铺设在施工位置上,然后将石料砌筑在砂浆上;S5:每砌筑好一层石料,采用铺砂装置将砂浆铺设在施工位置上,然后将石料砌筑在砂浆上,直至完成石料砌筑。本申请具有减少石料堆砌时需要较多的人工在石料上铺设砂浆,使投入的施工人员较多,降低施工效率的效果。
Grouted rubble construction process
The invention discloses a grouted rubble construction process which comprises the following steps: S1, before construction, setting out a construction site by a constructor, and confirming a construction position; s2, a foundation pit is excavated, after the position of the foundation pit is confirmed, the foundation pit is excavated manually in cooperation with a machine, and after the foundation pit is excavated, the foundation pit is inspected; s3, foundation manufacturing is conducted, specifically, mortar prepared in advance is poured into the foundation pit which is inspected to be qualified, and the foundation is formed after the mortar is solidified; s4, a wall is built, specifically, mortar is laid on the construction position through a sand laying device, and then stone is built on the mortar; and S5, every time a layer of stone is built, the mortar is laid on the construction position through a sand laying device, and then the stone is built on the mortar till stone building is completed. The construction method has the effects that the situation that mortar needs to be laid on the stones by more workers during stone stacking, so that more constructors are invested, and the construction efficiency is reduced is reduced.
本发明公开了一种浆砌石施工工艺,包括S1:施工前,由施工人员对施工现场进行放样,确认施工位置;S2:基坑开挖,确认好基坑位置后,采用人工配合机械开挖基坑,基坑开挖好后,对基坑进行检验;S3:地基制作,将提前准备好的砂浆倒入检验合格的基坑中,待砂浆凝固后形成地基;S4:砌筑墙体,通过铺砂装置将砂浆铺设在施工位置上,然后将石料砌筑在砂浆上;S5:每砌筑好一层石料,采用铺砂装置将砂浆铺设在施工位置上,然后将石料砌筑在砂浆上,直至完成石料砌筑。本申请具有减少石料堆砌时需要较多的人工在石料上铺设砂浆,使投入的施工人员较多,降低施工效率的效果。
Grouted rubble construction process
一种浆砌石施工工艺
LIU CHUNYANG (author) / LIU PING (author) / LIU SHIYU (author) / YEN SHIH-CHIEH (author) / CHEN HAN (author)
2023-01-13
Patent
Electronic Resource
Chinese
Scaffold for construction of grouted rubble retaining wall
European Patent Office | 2024
|Guardrail for construction of grouted rubble retaining wall
European Patent Office | 2024
|Automatic water filtering device for grouted rubble retaining wall
European Patent Office | 2024
|