High slope grouted rubble hoisting method
The invention relates to the technical field of civil engineering construction, in particular to a high slope masonry hoisting method which comprises the following steps: S1, comprehensively checking and maintaining a steel wire rope, a lifting hook and a masonry container of hoisting equipment to ensure that the hoisting capacity, the stability and the safety of the equipment meet hoisting requirements; s2, after the brickwork is transported to the designated position of the construction site, the brickwork is manually carried and unloaded and placed in order; s3, the truck crane enters a designated position according to manual command, a masonry container is fixed to a steel wire rope of a hoisting arm of the truck crane, and the safety performance of each hoisting device is checked again; s4, when the truck-mounted crane operator operates the truck-mounted crane to hoist the masonry container to the masonry placing position, the constructor puts the masonry into the masonry container; s5, the masonry container safety buckle is locked, and the hoisting transportation process is started; and S6, after the truck-mounted crane operator operates the truck-mounted crane to stably hoist the masonry container to the masonry working face, the safety buckles are unfastened, the masonry is manually unloaded and placed normatively, and anti-skid facilities are made.
本发明涉及土木工程施工技术领域,具体为一种高边坡浆砌石吊装方法,包括以下步骤:S1:对吊装设备的钢丝绳、吊钩和砌体盛器进行全面的检查和维护,确保设备的起重能力、稳定性和安全性满足吊装要求;S2:砌体运输至施工场地指定位置后由人工搬卸并摆放整齐;S3:汽车吊按照人工指挥进入指定位置,在汽车吊吊装臂钢丝绳上固定好砌体盛器,并再次检查各吊装设备的安全性能;S4:待汽车吊操作人员操作汽车吊将砌体盛器吊至砌体摆放处时,施工人员将砌体装入砌体盛器;S5:锁紧砌体盛器安全卡扣,开始吊装运输过程;S6:待汽车吊操作人员操作汽车吊将砌体盛器稳定吊至砌筑工作面后,解开安全卡扣,人工卸下砌体,规范摆放,做好防滑设施。
High slope grouted rubble hoisting method
The invention relates to the technical field of civil engineering construction, in particular to a high slope masonry hoisting method which comprises the following steps: S1, comprehensively checking and maintaining a steel wire rope, a lifting hook and a masonry container of hoisting equipment to ensure that the hoisting capacity, the stability and the safety of the equipment meet hoisting requirements; s2, after the brickwork is transported to the designated position of the construction site, the brickwork is manually carried and unloaded and placed in order; s3, the truck crane enters a designated position according to manual command, a masonry container is fixed to a steel wire rope of a hoisting arm of the truck crane, and the safety performance of each hoisting device is checked again; s4, when the truck-mounted crane operator operates the truck-mounted crane to hoist the masonry container to the masonry placing position, the constructor puts the masonry into the masonry container; s5, the masonry container safety buckle is locked, and the hoisting transportation process is started; and S6, after the truck-mounted crane operator operates the truck-mounted crane to stably hoist the masonry container to the masonry working face, the safety buckles are unfastened, the masonry is manually unloaded and placed normatively, and anti-skid facilities are made.
本发明涉及土木工程施工技术领域,具体为一种高边坡浆砌石吊装方法,包括以下步骤:S1:对吊装设备的钢丝绳、吊钩和砌体盛器进行全面的检查和维护,确保设备的起重能力、稳定性和安全性满足吊装要求;S2:砌体运输至施工场地指定位置后由人工搬卸并摆放整齐;S3:汽车吊按照人工指挥进入指定位置,在汽车吊吊装臂钢丝绳上固定好砌体盛器,并再次检查各吊装设备的安全性能;S4:待汽车吊操作人员操作汽车吊将砌体盛器吊至砌体摆放处时,施工人员将砌体装入砌体盛器;S5:锁紧砌体盛器安全卡扣,开始吊装运输过程;S6:待汽车吊操作人员操作汽车吊将砌体盛器稳定吊至砌筑工作面后,解开安全卡扣,人工卸下砌体,规范摆放,做好防滑设施。
High slope grouted rubble hoisting method
一种高边坡浆砌石吊装方法
LIU QI (author) / ZHANG YANZHONG (author) / YANG YOUSHI (author) / WANG GUAN (author) / ZHANG DAPENG (author) / LI PENG (author)
2024-07-26
Patent
Electronic Resource
Chinese
Anchor rod and ground beam grouted rubble lattice slope protection combined structure
European Patent Office | 2021
|Slip-resistant pile and greening strip combined grouted rubble road slope protection structure
European Patent Office | 2021
|Scaffold for construction of grouted rubble retaining wall
European Patent Office | 2024
|