A platform for research: civil engineering, architecture and urbanism
Vegetation construction method of grouted rubble
The invention provides a vegetation construction method of grouted rubble, and relates to the technical field of ecological restoration of river revetments. The method comprises a preparation stage, a block selection and masonry stage and a biological introduction stage. Through the steps of a preparation stage, a block selection and building stage, a biological introduction stage and the like, animal inhabitation, plant growth environment, diversity of microorganisms and the like of a revetment water soaking area and a water leaving area are fully considered, the effects of stabilizing a revetment wall, protecting the embankment and the like are achieved by building the revetment, meanwhile, the revetment is built by adopting masonry, and the construction cost is reduced. The stability and the stability of the revetment structure are ensured; by introducing organisms on the revetment, organic fusion of the revetment and the local ecological environment is realized, the attractiveness of the revetment landscape is improved, and the damage of the revetment adopting the masonry structure to the ecological environment is reduced.
本发明提供了一种浆砌石的植生施工方法,涉及河流驳岸生态修复技术领域。该方法包括:准备阶段、块体选择与砌筑阶段、生物引入阶段。本发明通过准备阶段、块体选择与砌筑阶段、生物引入阶段等步骤,以充分考虑驳岸浸水区和离水区的动物栖息、植物生长环境、微生物的多样性等,在通过修建驳岸起到稳固岸壁、保护堤岸等作用的同时,通过采用浆砌石构筑驳岸,保证了驳岸结构的稳定性和稳固性;通过在驳岸上引入生物,实现了驳岸与当地生态环境的有机融合,提升了驳岸景观的美观性,且降低采用浆砌石构筑物的驳岸对所在处生态环境的破坏。
Vegetation construction method of grouted rubble
The invention provides a vegetation construction method of grouted rubble, and relates to the technical field of ecological restoration of river revetments. The method comprises a preparation stage, a block selection and masonry stage and a biological introduction stage. Through the steps of a preparation stage, a block selection and building stage, a biological introduction stage and the like, animal inhabitation, plant growth environment, diversity of microorganisms and the like of a revetment water soaking area and a water leaving area are fully considered, the effects of stabilizing a revetment wall, protecting the embankment and the like are achieved by building the revetment, meanwhile, the revetment is built by adopting masonry, and the construction cost is reduced. The stability and the stability of the revetment structure are ensured; by introducing organisms on the revetment, organic fusion of the revetment and the local ecological environment is realized, the attractiveness of the revetment landscape is improved, and the damage of the revetment adopting the masonry structure to the ecological environment is reduced.
本发明提供了一种浆砌石的植生施工方法,涉及河流驳岸生态修复技术领域。该方法包括:准备阶段、块体选择与砌筑阶段、生物引入阶段。本发明通过准备阶段、块体选择与砌筑阶段、生物引入阶段等步骤,以充分考虑驳岸浸水区和离水区的动物栖息、植物生长环境、微生物的多样性等,在通过修建驳岸起到稳固岸壁、保护堤岸等作用的同时,通过采用浆砌石构筑驳岸,保证了驳岸结构的稳定性和稳固性;通过在驳岸上引入生物,实现了驳岸与当地生态环境的有机融合,提升了驳岸景观的美观性,且降低采用浆砌石构筑物的驳岸对所在处生态环境的破坏。
Vegetation construction method of grouted rubble
一种浆砌石的植生施工方法
WU LIANGYONG (author) / LIU TAO (author) / CHEN DENGDENG (author) / ZHAO JINBO (author) / LIU QIANGSHENG (author) / GE SONG (author) / WANG HUISHENG (author) / ZHU HAILIN (author) / LIU KE (author)
2024-04-26
Patent
Electronic Resource
Chinese
Scaffold for construction of grouted rubble retaining wall
European Patent Office | 2024
|Guardrail for construction of grouted rubble retaining wall
European Patent Office | 2024
|Automatic water filtering device for grouted rubble retaining wall
European Patent Office | 2024
|