Wall buried line pipe laying construction method
The invention relates to a wall buried line pipe laying construction method, and belongs to the technical field of line pipe construction, and the wall buried line pipe laying construction method comprises the following steps: S1, determining trepanning positions on building blocks at line pipe laying positions, and trepanning the corresponding building blocks; s2, masonry wall building is conducted, the perforated building blocks are built in the corresponding positions, and a line pipe pre-burying space is formed; s3, before top sealing of the masonry wall, a line pipe is inserted into the reserved line pipe pre-burying space and connected with a line box in the line box groove, the line box is fixed square and firm through masonry mortar, the construction method has the advantages that the wall surface does not need to be damaged in the later period, pollution to the construction environment is reduced, meanwhile, the quality problem that the wall surface at the grooving part is prone to cracking after grooving repairing is avoided, and the construction quality is improved. And the attractive appearance of the wall body is ensured.
本申请涉及一种墙体暗埋式线管布设施工方法,属于线管施工的技术领域,其包括:S1、在布设线管部位的砌块上确定开孔位置,将对应的砌块进行开孔;S2、进行砌体墙砌筑,并将开孔后的砌块砌筑在对应位置,形成线管预埋空间;S3、在砌体墙封顶前将线管插入预留的线管预埋空间内并与线盒槽内的线盒连接,线盒采用砌筑砂浆固定方正牢靠,本申请具有不用后期破坏墙面,减少了对施工环境污染的效果,同时避免了开槽修补后开槽部位墙面易开裂的质量问题,保证了墙体的美观。
Wall buried line pipe laying construction method
The invention relates to a wall buried line pipe laying construction method, and belongs to the technical field of line pipe construction, and the wall buried line pipe laying construction method comprises the following steps: S1, determining trepanning positions on building blocks at line pipe laying positions, and trepanning the corresponding building blocks; s2, masonry wall building is conducted, the perforated building blocks are built in the corresponding positions, and a line pipe pre-burying space is formed; s3, before top sealing of the masonry wall, a line pipe is inserted into the reserved line pipe pre-burying space and connected with a line box in the line box groove, the line box is fixed square and firm through masonry mortar, the construction method has the advantages that the wall surface does not need to be damaged in the later period, pollution to the construction environment is reduced, meanwhile, the quality problem that the wall surface at the grooving part is prone to cracking after grooving repairing is avoided, and the construction quality is improved. And the attractive appearance of the wall body is ensured.
本申请涉及一种墙体暗埋式线管布设施工方法,属于线管施工的技术领域,其包括:S1、在布设线管部位的砌块上确定开孔位置,将对应的砌块进行开孔;S2、进行砌体墙砌筑,并将开孔后的砌块砌筑在对应位置,形成线管预埋空间;S3、在砌体墙封顶前将线管插入预留的线管预埋空间内并与线盒槽内的线盒连接,线盒采用砌筑砂浆固定方正牢靠,本申请具有不用后期破坏墙面,减少了对施工环境污染的效果,同时避免了开槽修补后开槽部位墙面易开裂的质量问题,保证了墙体的美观。
Wall buried line pipe laying construction method
一种墙体暗埋式线管布设施工方法
LIU ZHISEN (author) / DU HUASHENG (author) / YANG WANGWANG (author) / LIU TIANCHENG (author) / SUN YUHANG (author) / ZHOU HUAJIE (author)
2023-01-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Large-pipe-diameter buried pipe laying structure in collapsible loess area and construction method
European Patent Office | 2020
|European Patent Office | 2024
|