A platform for research: civil engineering, architecture and urbanism
Underground diaphragm wall joint construction device
The invention relates to the related field of civil foundation engineering machinery, in particular to an underground diaphragm wall joint construction device which is characterized in that mud cakes on the surface of an underground diaphragm wall construction joint are fully removed through a steel wire brush, cleaning abrasive paper and a spray-washing head, so that the mud cake removal use effect of the whole device is effectively improved; a pressure spring is connected between a fixing plate and a second mounting plate, a steel wire brush is fixedly connected with the surface of the fixing plate through a spherical bearing, and an elastic rubber layer is filled between a cleaning roller and cleaning abrasive paper, so that the steel wire brush and the cleaning abrasive paper are in full contact with the underground diaphragm wall construction joint; the action range of the wall brushing device is greatly expanded through the compression spring, the spherical bearing and the elastic rubber layer, and the wall brushing effect is improved, so that the integrity of the underground diaphragm wall is enhanced, and the problem of water leakage after construction is solved.
本发明涉及土建基础工程机械相关领域,具体为一种地下连续墙接头施工装置,本发明通过钢丝刷、清洁砂纸和喷洗头对地下连续墙施工接头表面的泥皮进行充分去除,有效提升整个装置的泥皮去除使用效果;通过固定板与第二安装板之间连接有压紧弹簧,钢丝刷通过球形轴承与固定板表面相固定连接,又因为清洁辊与清洁砂纸之间填充有弹性橡胶层,从而使钢丝刷和清洁砂纸与地下连续墙施工接头充分接触,特别当锁口管发生轻微变形,压紧弹簧、球形轴承和弹性橡胶层大大延展刷壁器的作用范围,改善了刷壁效果,从而增强地下连续墙的整体性,有利于减少施工结束后的渗漏水问题。
Underground diaphragm wall joint construction device
The invention relates to the related field of civil foundation engineering machinery, in particular to an underground diaphragm wall joint construction device which is characterized in that mud cakes on the surface of an underground diaphragm wall construction joint are fully removed through a steel wire brush, cleaning abrasive paper and a spray-washing head, so that the mud cake removal use effect of the whole device is effectively improved; a pressure spring is connected between a fixing plate and a second mounting plate, a steel wire brush is fixedly connected with the surface of the fixing plate through a spherical bearing, and an elastic rubber layer is filled between a cleaning roller and cleaning abrasive paper, so that the steel wire brush and the cleaning abrasive paper are in full contact with the underground diaphragm wall construction joint; the action range of the wall brushing device is greatly expanded through the compression spring, the spherical bearing and the elastic rubber layer, and the wall brushing effect is improved, so that the integrity of the underground diaphragm wall is enhanced, and the problem of water leakage after construction is solved.
本发明涉及土建基础工程机械相关领域,具体为一种地下连续墙接头施工装置,本发明通过钢丝刷、清洁砂纸和喷洗头对地下连续墙施工接头表面的泥皮进行充分去除,有效提升整个装置的泥皮去除使用效果;通过固定板与第二安装板之间连接有压紧弹簧,钢丝刷通过球形轴承与固定板表面相固定连接,又因为清洁辊与清洁砂纸之间填充有弹性橡胶层,从而使钢丝刷和清洁砂纸与地下连续墙施工接头充分接触,特别当锁口管发生轻微变形,压紧弹簧、球形轴承和弹性橡胶层大大延展刷壁器的作用范围,改善了刷壁效果,从而增强地下连续墙的整体性,有利于减少施工结束后的渗漏水问题。
Underground diaphragm wall joint construction device
一种地下连续墙接头施工装置
KANG JINGYU (author) / JIN GUOLONG (author) / LI YUN (author) / ZHANG YIN (author) / WEI JUNYANG (author) / MAO YANLI (author) / ZHU ZHENZHOU (author)
2023-01-20
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underground diaphragm wall joint and construction method of underground diaphragm wall
European Patent Office | 2023
|Joint device for underground diaphragm wall construction
European Patent Office | 2024
|Construction method of underground diaphragm wall and butt joint of underground diaphragm wall
European Patent Office | 2020
|European Patent Office | 2022
|