A platform for research: civil engineering, architecture and urbanism
Construction method of pile frame system of large pile driving barge
The invention discloses a construction method of a large pile driving barge pile frame system, and relates to the technical field of pile driving barge pile frame construction. The construction method comprises the following steps that the pile frame is divided into four sections; respectively manufacturing the four sections; the third segment and the second segment are in butt joint, then the first segment and the second segment are in butt joint, and the fourth segment and the third segment are in butt joint; measuring after folding; coating and regional fitting-out are carried out after the inspection is qualified; and an auxiliary system is mounted on the pile frame. The method has the advantages that the pile frame is constructed in a segmented mode, machining can be conducted in the segmented stage, the construction period is shortened, then the four segments are folded, and the assembly precision is improved; the auxiliary system is installed on the pile frame, the force measuring system is easier to maintain and overhaul, and the piling system can still work during overhaul; the elevator system is low in driving noise, multiple safety protections are arranged, the use safety is improved, and operation is more convenient; the adjusting system corresponding to the piling center is more convenient to adjust, operation risks are reduced, and the structure is more reliable.
本发明公开了一种大型打桩船桩架系统的建造方法,它涉及打桩船桩架建造技术领域。建造方法包括以下步骤:将桩架划分为四个分段;将四个分段分别制作;先将第三分段与第二分段对接,再将第一分段与第二分段、第四分段与第三分段分别对接;合拢后测量;检验合格后进行涂装和区域舾装;在桩架上安装辅助系统。本发明的优点在于:将桩架分段建造,在分段阶段即可进行机加工,降低施工周期,再将四个分段进行合拢,装配精度提升;在桩架上安装辅助系统,测力系统更易维护和检修,检修时打桩系统仍然可以工作;升降梯系统驱动噪音小,且设置多重安全防护,提高使用安全性,操作更便利;对应打桩中心的调节系统调节更便利,降低作业风险,结构更可靠。
Construction method of pile frame system of large pile driving barge
The invention discloses a construction method of a large pile driving barge pile frame system, and relates to the technical field of pile driving barge pile frame construction. The construction method comprises the following steps that the pile frame is divided into four sections; respectively manufacturing the four sections; the third segment and the second segment are in butt joint, then the first segment and the second segment are in butt joint, and the fourth segment and the third segment are in butt joint; measuring after folding; coating and regional fitting-out are carried out after the inspection is qualified; and an auxiliary system is mounted on the pile frame. The method has the advantages that the pile frame is constructed in a segmented mode, machining can be conducted in the segmented stage, the construction period is shortened, then the four segments are folded, and the assembly precision is improved; the auxiliary system is installed on the pile frame, the force measuring system is easier to maintain and overhaul, and the piling system can still work during overhaul; the elevator system is low in driving noise, multiple safety protections are arranged, the use safety is improved, and operation is more convenient; the adjusting system corresponding to the piling center is more convenient to adjust, operation risks are reduced, and the structure is more reliable.
本发明公开了一种大型打桩船桩架系统的建造方法,它涉及打桩船桩架建造技术领域。建造方法包括以下步骤:将桩架划分为四个分段;将四个分段分别制作;先将第三分段与第二分段对接,再将第一分段与第二分段、第四分段与第三分段分别对接;合拢后测量;检验合格后进行涂装和区域舾装;在桩架上安装辅助系统。本发明的优点在于:将桩架分段建造,在分段阶段即可进行机加工,降低施工周期,再将四个分段进行合拢,装配精度提升;在桩架上安装辅助系统,测力系统更易维护和检修,检修时打桩系统仍然可以工作;升降梯系统驱动噪音小,且设置多重安全防护,提高使用安全性,操作更便利;对应打桩中心的调节系统调节更便利,降低作业风险,结构更可靠。
Construction method of pile frame system of large pile driving barge
一种大型打桩船桩架系统的建造方法
SUN MINFENG (author) / CHEN XINHUA (author) / LI JIE (author) / WANG QIUSONG (author) / GAO XIAODONG (author) / LI LI (author) / JIANG DONGKAI (author) / SONG YUFU (author) / HE YINDONG (author) / LU JIAN (author)
2023-01-20
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile driving barge pile frame pile reversing mechanism and working method thereof
European Patent Office | 2024
|Distributed large pile driving barge and pile driving operation method
European Patent Office | 2023
|Pile frame system of waterborne detachable multi-positioning pile driving barge
European Patent Office | 2020
|