Concrete diaphragm wall construction device and construction method
The invention provides a concrete diaphragm wall construction device and method. The concrete diaphragm wall construction device comprises a pouring assembly, and the pouring assembly comprises two mounting plates, two guide rails, two sliding blocks, a lead screw, two limiting blocks, a gear motor, two guide rings, two connecting columns, four connecting plates, two bolts, a first liquid level probe, a second liquid level probe, a guide pipe, a warning lamp and a controller. The adjacent faces of the four connecting plates are symmetrically welded to the outer side walls of the two guide rings. The depth of the conduit embedded in concrete is monitored through the first liquid level probe and the second liquid level probe, the first liquid level probe transmits a signal to the controller, the warning lamp flickers to give an alarm, an external worker adjusts the lifting height of the conduit at the moment, in a similar way, when the embedding depth of the conduit is larger than six meters, the warning lamp flickers again to give an alarm, and the conduit is prevented from being damaged. And therefore, an external worker can conveniently control the lifting height of the guide pipe, and the quality of the concrete diaphragm wall is guaranteed.
本发明提供了一种砼防渗墙施工装置及施工方法,包括浇筑组件,所述浇筑组件包括两个安装板、两个导轨、两个滑块、丝杆、两个限位块、减速电机、两个导向环、两个连接柱、四个连接板、两个螺栓、第一液位探头、第二液位探头、导管、警示灯和控制器;四个所述连接板的相邻面对称焊接于两个所述导向环的外侧壁。本发明通过第一液位探头和第二液位探头对导管埋入混凝土的深度进行监测,第一液位探头将信号传输至控制器,警示灯闪烁报警,此时外部工作人员调整导管的吊升高度,同理,当导管的埋入深度大于六米时,警示灯再次闪烁报警,进而方便外部工作人员把控导管的吊升高度,保证了砼防渗墙的质量。
Concrete diaphragm wall construction device and construction method
The invention provides a concrete diaphragm wall construction device and method. The concrete diaphragm wall construction device comprises a pouring assembly, and the pouring assembly comprises two mounting plates, two guide rails, two sliding blocks, a lead screw, two limiting blocks, a gear motor, two guide rings, two connecting columns, four connecting plates, two bolts, a first liquid level probe, a second liquid level probe, a guide pipe, a warning lamp and a controller. The adjacent faces of the four connecting plates are symmetrically welded to the outer side walls of the two guide rings. The depth of the conduit embedded in concrete is monitored through the first liquid level probe and the second liquid level probe, the first liquid level probe transmits a signal to the controller, the warning lamp flickers to give an alarm, an external worker adjusts the lifting height of the conduit at the moment, in a similar way, when the embedding depth of the conduit is larger than six meters, the warning lamp flickers again to give an alarm, and the conduit is prevented from being damaged. And therefore, an external worker can conveniently control the lifting height of the guide pipe, and the quality of the concrete diaphragm wall is guaranteed.
本发明提供了一种砼防渗墙施工装置及施工方法,包括浇筑组件,所述浇筑组件包括两个安装板、两个导轨、两个滑块、丝杆、两个限位块、减速电机、两个导向环、两个连接柱、四个连接板、两个螺栓、第一液位探头、第二液位探头、导管、警示灯和控制器;四个所述连接板的相邻面对称焊接于两个所述导向环的外侧壁。本发明通过第一液位探头和第二液位探头对导管埋入混凝土的深度进行监测,第一液位探头将信号传输至控制器,警示灯闪烁报警,此时外部工作人员调整导管的吊升高度,同理,当导管的埋入深度大于六米时,警示灯再次闪烁报警,进而方便外部工作人员把控导管的吊升高度,保证了砼防渗墙的质量。
Concrete diaphragm wall construction device and construction method
一种砼防渗墙施工装置及施工方法
ZHAO YINGYING (author) / LIANG HUICHAO (author) / HE XIAOLONG (author) / BAI XUEBIN (author) / FU BINFEN (author) / LIN YONGJUN (author) / CHEN WANG (author) / QIN RUI (author) / ZHANG LIQING (author) / ZHONG YONGDONG (author)
2023-01-31
Patent
Electronic Resource
Chinese