Wave pile crown beam formwork integrated device and construction method
The invention discloses a wave pile crown beam formwork integrated device and a construction method. The wave pile crown beam formwork integrated device comprises an L-shaped formwork composed of a bottom formwork and a side formwork. Angle steel is connected to the surface of the joint of the bottom die and the side die; a rubber ring is arranged at the joint of the bottom die and the wave pile at the lower part along the edge for sealing; a transverse tensioning device is arranged at the top of the side die, and an obliquely-upward tensioning device is connected to the upper surface of the bottom die. According to the device and the construction method, the problems that during construction of an existing wave pile crown beam, the formwork is difficult to install in the air or on the water side, the stability is poor, the installation and dismantling procedures are tedious, and the danger is high are solved, and the device and the construction method have the advantages of being stable in structure, safe, reliable, simple in arrangement mode, high in construction convenience and easy to demould and dismantle subsequently.
本发明公开了一种波浪桩冠梁模板一体化装置及施工方法,包括底模和侧模组成的L型模板;底模和侧模接缝处表面连接有角钢;底模与下部的波浪桩连接处沿着边缘设置有橡胶圈进行密封;侧模顶部设置有横向拉紧装置,底模上表面连接有斜向上拉紧装置。该装置及施工方法解决了现有波浪桩冠梁施工时模板临空或临水侧安装困难,稳定性差,安装和拆除工序繁琐且危险性高的问题,具有结构稳定、安全可靠,布设方式简单,施工便利性强,后续易于脱模拆除的特点。
Wave pile crown beam formwork integrated device and construction method
The invention discloses a wave pile crown beam formwork integrated device and a construction method. The wave pile crown beam formwork integrated device comprises an L-shaped formwork composed of a bottom formwork and a side formwork. Angle steel is connected to the surface of the joint of the bottom die and the side die; a rubber ring is arranged at the joint of the bottom die and the wave pile at the lower part along the edge for sealing; a transverse tensioning device is arranged at the top of the side die, and an obliquely-upward tensioning device is connected to the upper surface of the bottom die. According to the device and the construction method, the problems that during construction of an existing wave pile crown beam, the formwork is difficult to install in the air or on the water side, the stability is poor, the installation and dismantling procedures are tedious, and the danger is high are solved, and the device and the construction method have the advantages of being stable in structure, safe, reliable, simple in arrangement mode, high in construction convenience and easy to demould and dismantle subsequently.
本发明公开了一种波浪桩冠梁模板一体化装置及施工方法,包括底模和侧模组成的L型模板;底模和侧模接缝处表面连接有角钢;底模与下部的波浪桩连接处沿着边缘设置有橡胶圈进行密封;侧模顶部设置有横向拉紧装置,底模上表面连接有斜向上拉紧装置。该装置及施工方法解决了现有波浪桩冠梁施工时模板临空或临水侧安装困难,稳定性差,安装和拆除工序繁琐且危险性高的问题,具有结构稳定、安全可靠,布设方式简单,施工便利性强,后续易于脱模拆除的特点。
Wave pile crown beam formwork integrated device and construction method
一种波浪桩冠梁模板一体化装置及施工方法
CHEN XIANGKE (author) / PENG LIANG (author) / CHEN MING (author) / HE XINYI (author) / SHI HAISONG (author) / HUANG FEN (author) / ZENG GUANGKE (author) / LEI LI (author) / TAN LIUPING (author) / YANG WEI (author)
2023-01-31
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Secant pile guide wall formwork and formwork supporting structure construction method
European Patent Office | 2021
|European Patent Office | 2023
|Formwork of single pile cap with berthing component and construction method of formwork
European Patent Office | 2023
|European Patent Office | 2021
|European Patent Office | 2024
|