A platform for research: civil engineering, architecture and urbanism
Arc building block assembled pipe gallery and assembling method thereof
The invention discloses an arc building block assembled pipe gallery and an assembling method thereof, and is characterized in that the arc building block assembled pipe gallery is formed by combining and assembling arc mortise and tenon building blocks through mortises and tenons, a drainage groove is formed on the outer surface of the pipe gallery after the pipe gallery is assembled, the arc mortise and tenon building blocks are formed by pressing through a high-tonnage machine, and integral arc mortise and tenon building blocks or combined arc mortise and tenon building blocks are arranged. Wherein the combined arc mortise and tenon building block is formed by combining an inner arc mortise and tenon building block and an outer arc mortise and tenon building block in a mortise and tenon mode. When the pipe gallery is assembled, the construction difficulty is small, the project progress is fast, the quality can be guaranteed, the maintenance cost is low, and the service cycle is long.
本发明公开了一种圆弧砌块拼装管廊及其拼装方法,其特征在于:由圆弧榫卯砌块通过榫卯组合拼装而成,管廊外表面在拼装后形成引流槽,所述圆弧榫卯砌块是用高吨位机械压制而成,有整体圆弧榫卯砌块或组合圆弧榫卯砌块,其中组合圆弧榫卯砌块是由内圆弧榫卯砌块和外圆弧榫卯砌块榫卯组合而成。本发明拼装管廊时施工难度小,工程进度快,质量能保证,维护成本低,使用周期长。
Arc building block assembled pipe gallery and assembling method thereof
The invention discloses an arc building block assembled pipe gallery and an assembling method thereof, and is characterized in that the arc building block assembled pipe gallery is formed by combining and assembling arc mortise and tenon building blocks through mortises and tenons, a drainage groove is formed on the outer surface of the pipe gallery after the pipe gallery is assembled, the arc mortise and tenon building blocks are formed by pressing through a high-tonnage machine, and integral arc mortise and tenon building blocks or combined arc mortise and tenon building blocks are arranged. Wherein the combined arc mortise and tenon building block is formed by combining an inner arc mortise and tenon building block and an outer arc mortise and tenon building block in a mortise and tenon mode. When the pipe gallery is assembled, the construction difficulty is small, the project progress is fast, the quality can be guaranteed, the maintenance cost is low, and the service cycle is long.
本发明公开了一种圆弧砌块拼装管廊及其拼装方法,其特征在于:由圆弧榫卯砌块通过榫卯组合拼装而成,管廊外表面在拼装后形成引流槽,所述圆弧榫卯砌块是用高吨位机械压制而成,有整体圆弧榫卯砌块或组合圆弧榫卯砌块,其中组合圆弧榫卯砌块是由内圆弧榫卯砌块和外圆弧榫卯砌块榫卯组合而成。本发明拼装管廊时施工难度小,工程进度快,质量能保证,维护成本低,使用周期长。
Arc building block assembled pipe gallery and assembling method thereof
一种圆弧砌块拼装管廊及其拼装方法
DUAN ZHIXIANG (author)
2023-01-31
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Assembled comprehensive pipe gallery and assembling method thereof
European Patent Office | 2021
|Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method
European Patent Office | 2020
|Pipe gallery prefabricating and assembling device and assembling method thereof
European Patent Office | 2024
|