High-rise building main body interpenetrating construction process
The invention discloses a high-rise building main body interpenetrating construction process in the technical field of high-rise buildings, which is characterized in that floor grouping construction of the high-rise building is realized through an attached lifting scaffold and a material frame, and the problem that main body structures of all floors need to be poured and formed in the traditional high-rise building is solved; and the construction situation of secondary structure and residual foundation installation engineering can be carried out. According to the scheme, the three stages of procedures of the building main structure, the secondary structure and the installation project are constructed alternately, cyclic operation can be conducted among all the sections along with the main body construction progress, the requirements for the total construction period, the construction quality, the forming quality, the construction efficiency and the like are met, the needed construction period is equivalent to the current main structure pouring forming period, the whole construction period is greatly prolonged, and the construction cost is reduced. The construction speed is increased; and the building quality is ensured.
本发明公开了高层建筑技术领域的高层建筑主体穿插施工工艺,其通过附着式升降脚手架和物料架实现高层建筑楼层分组施工,摒弃了传统高层建筑需要全部楼层的主体结构浇筑成型完工后,才能开展二次结构和剩余基础安装工程的施工现状。本方案对建筑主体结构、二次结构、安装工程三个阶段工序穿插施工,能够随主体施工进度在各段之间循环作业,满足施工总工期、施工质量、成型质量、施工效率等要求,所需工期与现状的主体结构浇筑成型周期相当,大大提高了整个工期,提高了施工速度和保证了建筑质量。
High-rise building main body interpenetrating construction process
The invention discloses a high-rise building main body interpenetrating construction process in the technical field of high-rise buildings, which is characterized in that floor grouping construction of the high-rise building is realized through an attached lifting scaffold and a material frame, and the problem that main body structures of all floors need to be poured and formed in the traditional high-rise building is solved; and the construction situation of secondary structure and residual foundation installation engineering can be carried out. According to the scheme, the three stages of procedures of the building main structure, the secondary structure and the installation project are constructed alternately, cyclic operation can be conducted among all the sections along with the main body construction progress, the requirements for the total construction period, the construction quality, the forming quality, the construction efficiency and the like are met, the needed construction period is equivalent to the current main structure pouring forming period, the whole construction period is greatly prolonged, and the construction cost is reduced. The construction speed is increased; and the building quality is ensured.
本发明公开了高层建筑技术领域的高层建筑主体穿插施工工艺,其通过附着式升降脚手架和物料架实现高层建筑楼层分组施工,摒弃了传统高层建筑需要全部楼层的主体结构浇筑成型完工后,才能开展二次结构和剩余基础安装工程的施工现状。本方案对建筑主体结构、二次结构、安装工程三个阶段工序穿插施工,能够随主体施工进度在各段之间循环作业,满足施工总工期、施工质量、成型质量、施工效率等要求,所需工期与现状的主体结构浇筑成型周期相当,大大提高了整个工期,提高了施工速度和保证了建筑质量。
High-rise building main body interpenetrating construction process
高层建筑主体穿插施工工艺
ZHANG TIANQING (author) / WANG WENYUAN (author) / MIN XU (author) / HUANG PENGRUI (author) / HU CHUN (author) / CHEN JUN (author) / ZHANG YU (author) / FU ZHENGQUAN (author) / ZHAO ZHIBO (author) / LUO JINHU (author)
2023-01-31
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Rapid interpenetrating flow construction method for high-rise building
European Patent Office | 2024
|Construction method of smoke exhaust flue in high-rise building main body structure
European Patent Office | 2022
|Main body structure reinforcing device of high-rise building
European Patent Office | 2021
|Super high-rise building main body structure paying-off method
European Patent Office | 2024
|European Patent Office | 2021
|