A platform for research: civil engineering, architecture and urbanism
Prefabricated assembly type prestressed composite sheet pile bank protection construction method
The invention relates to a construction method for a prefabricated assembly type prestressed composite sheet pile bank protection. The construction method comprises the steps that S1, prefabricated bank protection piles and prefabricated connecting sheet piles are transported and stacked; s2, excavating a guide groove; s3, mounting and debugging a guide control frame; s4, the prefabricated bank protection piles are sunk; s5, connecting sheet pile construction; and S6, a top crown beam system is constructed. The prefabricated assembly type prestressed composite sheet pile revetment has the beneficial effects that the construction speed is high, the construction precision is high, the post-construction stability is high, the construction advantages of high stability, high efficiency, high benefits and the like are achieved during implementation, and the technical benefits are remarkable.
本发明涉及一种预制装配式预应力组合板桩护岸施工方法,包括步骤:S1、预制护岸桩及预制连接板桩运输及堆放;S2、导槽开挖;S3、导向控制架安装与调试;S4、预制护岸桩沉桩;S5、连接板桩施工;S6、顶部冠梁体系施工。本发明的有益效果是:本发明所涉及的预制装配式预应力组合板桩护岸施工速度快,施工精度高,工后稳定性强,实施时具有高稳定、高效率、高效益等诸多施工优势,技术效益显著。
Prefabricated assembly type prestressed composite sheet pile bank protection construction method
The invention relates to a construction method for a prefabricated assembly type prestressed composite sheet pile bank protection. The construction method comprises the steps that S1, prefabricated bank protection piles and prefabricated connecting sheet piles are transported and stacked; s2, excavating a guide groove; s3, mounting and debugging a guide control frame; s4, the prefabricated bank protection piles are sunk; s5, connecting sheet pile construction; and S6, a top crown beam system is constructed. The prefabricated assembly type prestressed composite sheet pile revetment has the beneficial effects that the construction speed is high, the construction precision is high, the post-construction stability is high, the construction advantages of high stability, high efficiency, high benefits and the like are achieved during implementation, and the technical benefits are remarkable.
本发明涉及一种预制装配式预应力组合板桩护岸施工方法,包括步骤:S1、预制护岸桩及预制连接板桩运输及堆放;S2、导槽开挖;S3、导向控制架安装与调试;S4、预制护岸桩沉桩;S5、连接板桩施工;S6、顶部冠梁体系施工。本发明的有益效果是:本发明所涉及的预制装配式预应力组合板桩护岸施工速度快,施工精度高,工后稳定性强,实施时具有高稳定、高效率、高效益等诸多施工优势,技术效益显著。
Prefabricated assembly type prestressed composite sheet pile bank protection construction method
预制装配式预应力组合板桩护岸施工方法
ZHANG PING (author) / JIN YAN (author) / ZHAO CHANGHAI (author) / MA RUI (author) / HE KAI (author) / CHEN XUELI (author) / YIN GUANGYUE (author) / GAN CHUANQIN (author)
2023-03-07
Patent
Electronic Resource
Chinese
Prefabricated assembly type internal prestressed anchoring pile
European Patent Office | 2016
|Rapid assembly type sheet pile bank protection structure
European Patent Office | 2021
|European Patent Office | 2024
|Manufacturing method of prefabricated bank protection pile
European Patent Office | 2023