A platform for research: civil engineering, architecture and urbanism
Construction system and construction method for building lightweight wall
The invention discloses a construction system and method for building a light wall. The construction system for building the light wall comprises a first material sliding plate, a second material sliding plate, a material groove and a material pushing plate. The first material sliding plate and the second material sliding plate are arranged in parallel, and a feeding cavity for containing the building light wall is formed between the first material sliding plate and the second material sliding plate. One end of the feeding cavity is connected with the installed and fixed building light wall in an inserted mode, the other end of the feeding cavity communicates with the material groove, and the material groove is used for sequentially containing the multiple building light walls to be spliced; the material pushing plate is in sliding connection with the material groove and can push the building lightweight wall to enter the feeding cavity; the first material sliding plate is provided with a window communicating with the feeding cavity and located at the connecting position of the building light wall. When the construction system is adopted for construction of the building light wall, only light physical labor such as polymer mortar smearing, building light wall fixing, mortar scraping and steel nail driving needs to be manually conducted, manual carrying and wall splicing are not needed, manpower is saved, automatic splicing is achieved, and the splicing efficiency is improved.
本发明公开了一种建筑轻质墙体的施工系统及施工方法,该建筑轻质墙体的施工系统包括第一滑料板、第二滑料板、料槽和推料板;第一滑料板和第二滑料板平行设置,两者之间设有容纳建筑轻质墙体的上料腔;上料腔的一端与完成安装固定的建筑轻质墙体插装连接,另一端与料槽连通,料槽用于依次放置多个待拼接的建筑轻质墙体;推料板与料槽滑动连接,能够推动建筑轻质墙体进入上料腔;第一滑料板上设有与上料腔连通的窗口,位于建筑轻质墙体连接的位置。采用该施工系统进行建筑轻质墙体的施工,只需人工进行聚合物砂浆涂抹、建筑轻质墙体的固定、砂浆刮平和打入钢钉等轻体力劳动,无需人工搬运和拼接墙体,节省人力,实现自动拼接,提高拼接效率。
Construction system and construction method for building lightweight wall
The invention discloses a construction system and method for building a light wall. The construction system for building the light wall comprises a first material sliding plate, a second material sliding plate, a material groove and a material pushing plate. The first material sliding plate and the second material sliding plate are arranged in parallel, and a feeding cavity for containing the building light wall is formed between the first material sliding plate and the second material sliding plate. One end of the feeding cavity is connected with the installed and fixed building light wall in an inserted mode, the other end of the feeding cavity communicates with the material groove, and the material groove is used for sequentially containing the multiple building light walls to be spliced; the material pushing plate is in sliding connection with the material groove and can push the building lightweight wall to enter the feeding cavity; the first material sliding plate is provided with a window communicating with the feeding cavity and located at the connecting position of the building light wall. When the construction system is adopted for construction of the building light wall, only light physical labor such as polymer mortar smearing, building light wall fixing, mortar scraping and steel nail driving needs to be manually conducted, manual carrying and wall splicing are not needed, manpower is saved, automatic splicing is achieved, and the splicing efficiency is improved.
本发明公开了一种建筑轻质墙体的施工系统及施工方法,该建筑轻质墙体的施工系统包括第一滑料板、第二滑料板、料槽和推料板;第一滑料板和第二滑料板平行设置,两者之间设有容纳建筑轻质墙体的上料腔;上料腔的一端与完成安装固定的建筑轻质墙体插装连接,另一端与料槽连通,料槽用于依次放置多个待拼接的建筑轻质墙体;推料板与料槽滑动连接,能够推动建筑轻质墙体进入上料腔;第一滑料板上设有与上料腔连通的窗口,位于建筑轻质墙体连接的位置。采用该施工系统进行建筑轻质墙体的施工,只需人工进行聚合物砂浆涂抹、建筑轻质墙体的固定、砂浆刮平和打入钢钉等轻体力劳动,无需人工搬运和拼接墙体,节省人力,实现自动拼接,提高拼接效率。
Construction system and construction method for building lightweight wall
一种建筑轻质墙体的施工系统及施工方法
HU HUIZHEN (author) / GUAN PING (author) / CHEN GUOCHAO (author)
2023-03-07
Patent
Electronic Resource
Chinese
Lightweight Building Construction
TIBKAT | 1977
|Building wall building construction system and construction method thereof
European Patent Office | 2021
|Shell-shaped wall column lightweight fabricated building module construction technology
European Patent Office | 2021
|Shear wall construction method, building construction method, shear wall and building
European Patent Office | 2020
|BUILDING CONSTRUCTION: LIGHTWEIGHT STEEL FRAMING
British Library Online Contents | 2008
|