A platform for research: civil engineering, architecture and urbanism
Installation method of swallow-type arch bridge arch rib cross beam
The invention relates to the field of arch bridge construction, in particular to a method for installing an arch rib cross beam of a flying swallow type arch bridge. The mounting method comprises the following steps: step 1, selecting a unit section to be hoisted; 2, hoisting equipment is adopted for hoisting the selected unit segments; 3, hoisting the corresponding unit sections to the bridge site by adopting hoisting equipment; 4, after the step 3 is completed, the positions of the corresponding unit segments are adjusted, and after adjustment is completed, the unit segments are installed and fixed; 5, after the step 4 is completed, installation of one unit segment is completed; the invention discloses a method for installing an arch rib cross beam of a flying swallow type arch bridge. According to the mounting method disclosed by the invention, rapid construction and mounting of the arch rib cross beam can be realized, meanwhile, through cooperative use of the hoisting equipment and the auxiliary adjusting device, accurate adjustment of each unit section in the arch rib cross beam can be realized, and the accuracy and rapidness of placement of the arch rib cross beam are greatly ensured.
本发明涉及拱桥施工领域,具体来说是一种飞燕式拱桥拱肋横梁的安装方法;所述安装方法包括如下步骤:步骤1:选取待吊装的单元节段;步骤2:采用吊装设备对选取后的单元节段进行吊装;步骤3:采用吊装设备吊装对应单元节段至桥位处;步骤4:步骤3完成后,对对应的单元节段进行位置调整,调整完毕后,进行单元节段的安装固定;步骤5:步骤4完成后,一个单元节段的安装完成;本发明公开了一种飞燕式拱桥拱肋横梁的安装方法;本发明公开的安装方法,可以实现拱肋横梁的快速施工安装,同时通过吊装设备、辅助调节装置的配合使用,可以实现拱肋横梁中各个单元节段的精准调节,极大的保证了拱肋横梁安放的准确性和快捷性。
Installation method of swallow-type arch bridge arch rib cross beam
The invention relates to the field of arch bridge construction, in particular to a method for installing an arch rib cross beam of a flying swallow type arch bridge. The mounting method comprises the following steps: step 1, selecting a unit section to be hoisted; 2, hoisting equipment is adopted for hoisting the selected unit segments; 3, hoisting the corresponding unit sections to the bridge site by adopting hoisting equipment; 4, after the step 3 is completed, the positions of the corresponding unit segments are adjusted, and after adjustment is completed, the unit segments are installed and fixed; 5, after the step 4 is completed, installation of one unit segment is completed; the invention discloses a method for installing an arch rib cross beam of a flying swallow type arch bridge. According to the mounting method disclosed by the invention, rapid construction and mounting of the arch rib cross beam can be realized, meanwhile, through cooperative use of the hoisting equipment and the auxiliary adjusting device, accurate adjustment of each unit section in the arch rib cross beam can be realized, and the accuracy and rapidness of placement of the arch rib cross beam are greatly ensured.
本发明涉及拱桥施工领域,具体来说是一种飞燕式拱桥拱肋横梁的安装方法;所述安装方法包括如下步骤:步骤1:选取待吊装的单元节段;步骤2:采用吊装设备对选取后的单元节段进行吊装;步骤3:采用吊装设备吊装对应单元节段至桥位处;步骤4:步骤3完成后,对对应的单元节段进行位置调整,调整完毕后,进行单元节段的安装固定;步骤5:步骤4完成后,一个单元节段的安装完成;本发明公开了一种飞燕式拱桥拱肋横梁的安装方法;本发明公开的安装方法,可以实现拱肋横梁的快速施工安装,同时通过吊装设备、辅助调节装置的配合使用,可以实现拱肋横梁中各个单元节段的精准调节,极大的保证了拱肋横梁安放的准确性和快捷性。
Installation method of swallow-type arch bridge arch rib cross beam
一种飞燕式拱桥拱肋横梁的安装方法
TANG QI (author) / WANG HAITAO (author) / FAN CHUNSHENG (author) / LI GUANGJUN (author) / WANG YONGMING (author) / GAN LIWEN (author) / ZHAO SHIJIE (author) / ZHU BANGZHI (author) / GAO LINLONG (author) / MA LEI (author)
2023-03-14
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Flying swallow type self-balancing arch bridge structure system
European Patent Office | 2024
|European Patent Office | 2023
|Tied-arch bridge arch rib support and tied-arch bridge arch rib installation method
European Patent Office | 2023
|Installation construction method for tied-arch bridge arch rib
European Patent Office | 2020
|Installation method and installation structure of steel arch bridge arch rib section
European Patent Office | 2020
|