Treatment method of permeable foundation pit
A treatment method of a permeable foundation pit solves the problems that existing foundation pit gushing water treatment is tedious, the effect is not remarkable, and the construction period is long. The construction method comprises the following steps: S1, constructing an upper step of the rock ballast cutoff ridge on the water facing side of the foundation pit; s2, constructing a lower step of the rock ballast cutoff ridge on the water facing side of the foundation pit; and S3, excavation of the foundation pit.
一种透水基坑的处理方法,解决了现在基坑涌水处理繁琐,且效果不显著,工期较长的问题。其包括如下步骤:S1,基坑临水侧石渣截水埂上台阶施工;S2,基坑临水侧石渣截水埂下台阶施工;S3,基坑开挖。
Treatment method of permeable foundation pit
A treatment method of a permeable foundation pit solves the problems that existing foundation pit gushing water treatment is tedious, the effect is not remarkable, and the construction period is long. The construction method comprises the following steps: S1, constructing an upper step of the rock ballast cutoff ridge on the water facing side of the foundation pit; s2, constructing a lower step of the rock ballast cutoff ridge on the water facing side of the foundation pit; and S3, excavation of the foundation pit.
一种透水基坑的处理方法,解决了现在基坑涌水处理繁琐,且效果不显著,工期较长的问题。其包括如下步骤:S1,基坑临水侧石渣截水埂上台阶施工;S2,基坑临水侧石渣截水埂下台阶施工;S3,基坑开挖。
Treatment method of permeable foundation pit
一种透水基坑的处理方法
CHEN DUNGANG (author) / CHEN WENJUAN (author) / JING RUOTING (author) / DIAO QINGTING (author)
2023-03-21
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
PERMEABLE ROAD CONSTRUCTION METHOD USING PERMEABLE TOP BASE FOUNDATION
European Patent Office | 2024
|Treatment by grouting of permeable foundation of dam
Engineering Index Backfile | 1962
|Construction method of bridge open caisson foundation of permeable soft foundation
European Patent Office | 2024
|Construction method of permeable immersed tube foundation structure
European Patent Office | 2023
|