A platform for research: civil engineering, architecture and urbanism
Construction method for reserved wire hole of distribution box groove
The invention discloses a reserved wire hole construction method for a distribution box groove, which comprises the following steps: S1, when a wall body is built, a prefabricated part is placed at a preset position; s2, a brick body is built along the periphery of the prefabricated part so as to support the prefabricated part; wherein reinforcing steel bars are embedded in the prefabricated part, the prefabricated part is integrally prefabricated and formed, the prefabricated part comprises a distribution box part and a lintel part, a distribution box groove is formed in one side face of the distribution box part, the lintel part is connected with the top of the distribution box part, the lintel part is transversely arranged, and the two ends of the lintel part in the length direction both exceed the distribution box part; the lintel part is provided with a plurality of reserved wire holes, and the reserved wire holes are communicated with the top of the distribution box groove. According to the method, a large number of chiseling procedures can be effectively avoided, and damage to the prefabricated lintel is avoided.
本发明公开了一种配电箱槽的预留线孔施工方法,包括以下步骤:S1、进行墙体砌筑时,将预制件放置于预设位置;S2、砖体沿着所述预制件的外围进行砌筑,以对所述预制件进行支撑;其中,所述预制件中埋设有钢筋并一体式预制成形,所述预制件包括配电箱部及过梁部,配电箱部的其中一侧面开设有配电箱槽,所述过梁部与所述配电箱部的顶部连接,所述过梁部横向设置且其长度方向的两端均超出所述配电箱部,所述过梁部开设有若干预留线孔,所述预留线孔与所述配电箱槽的顶部连通。本发明能够有效避免大量的剔凿工序,避免对预制过梁的损害。
Construction method for reserved wire hole of distribution box groove
The invention discloses a reserved wire hole construction method for a distribution box groove, which comprises the following steps: S1, when a wall body is built, a prefabricated part is placed at a preset position; s2, a brick body is built along the periphery of the prefabricated part so as to support the prefabricated part; wherein reinforcing steel bars are embedded in the prefabricated part, the prefabricated part is integrally prefabricated and formed, the prefabricated part comprises a distribution box part and a lintel part, a distribution box groove is formed in one side face of the distribution box part, the lintel part is connected with the top of the distribution box part, the lintel part is transversely arranged, and the two ends of the lintel part in the length direction both exceed the distribution box part; the lintel part is provided with a plurality of reserved wire holes, and the reserved wire holes are communicated with the top of the distribution box groove. According to the method, a large number of chiseling procedures can be effectively avoided, and damage to the prefabricated lintel is avoided.
本发明公开了一种配电箱槽的预留线孔施工方法,包括以下步骤:S1、进行墙体砌筑时,将预制件放置于预设位置;S2、砖体沿着所述预制件的外围进行砌筑,以对所述预制件进行支撑;其中,所述预制件中埋设有钢筋并一体式预制成形,所述预制件包括配电箱部及过梁部,配电箱部的其中一侧面开设有配电箱槽,所述过梁部与所述配电箱部的顶部连接,所述过梁部横向设置且其长度方向的两端均超出所述配电箱部,所述过梁部开设有若干预留线孔,所述预留线孔与所述配电箱槽的顶部连通。本发明能够有效避免大量的剔凿工序,避免对预制过梁的损害。
Construction method for reserved wire hole of distribution box groove
一种配电箱槽的预留线孔施工方法
LI LIN (author) / SHAO HAIFENG (author) / LIU JINCHENG (author) / ZHU MINGMIN (author) / YANG MING (author) / QI CHENJIN (author) / LI CHUAN (author) / LI LIANGDONG (author) / WANG HUAN (author)
2023-04-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Flue reserved tongue-and-groove hanging-hole-free construction method
European Patent Office | 2024
|