A platform for research: civil engineering, architecture and urbanism
Water taking head construction locking steel pipe pile cofferdam
The invention relates to a water taking head construction locking steel pipe pile cofferdam. The water taking head construction fore shaft steel pipe pile cofferdam comprises fore shaft steel pipe piles, ring beams and inner supports. The square frame structure is defined by the locking piles which are buckled pairwise, the locking steel pipe piles are formed, the ring beam is fixed in the locking steel pipe piles, meanwhile, the ring beam is supported through the inner supports, the structure is firm, stress is uniform, water can be effectively prevented, and water head taking or other construction can be conveniently conducted in the locking steel pipe piles. Guide columns are arranged on the two sides of a buckling connecting plate correspondingly, so that when the locking pipes and the buckling connecting plates of every two adjacent locking piles are buckled, the buckling connecting plates are matched with openings of the locking pipes, and the guide columns are matched with the inner side walls of the openings of the locking pipes. And the buckling connecting plate and the opening locking pipe are tightly buckled, and the waterproof and leaking stoppage performance between the opening locking piles is improved.
本发明涉及一种取水头施工锁口钢管桩围堰。本发明所述的一种取水头施工锁口钢管桩围堰,包括锁口钢管桩、圈梁、内支撑。通过两两扣合的锁口桩围合成方形框体结构,形成锁口钢管桩,将圈梁固定在锁口钢管桩内,同时利用所述内支撑来支撑圈梁,结构结实,受力均匀,能有效地防水,方便在锁口钢管桩内进行取水头或其他的施工。通过扣合连接板的两侧分别设置有导向柱,使相邻的两根锁口桩的所述锁口管和所述扣合连接板扣合时,所述扣合连接板与所述锁口管的开口配合、所述导向柱与所述锁口管的开口处的内侧壁配合;使所述扣合连接板与所述锁口管扣合紧密,提升了所述锁口桩之间的防水堵漏性能。
Water taking head construction locking steel pipe pile cofferdam
The invention relates to a water taking head construction locking steel pipe pile cofferdam. The water taking head construction fore shaft steel pipe pile cofferdam comprises fore shaft steel pipe piles, ring beams and inner supports. The square frame structure is defined by the locking piles which are buckled pairwise, the locking steel pipe piles are formed, the ring beam is fixed in the locking steel pipe piles, meanwhile, the ring beam is supported through the inner supports, the structure is firm, stress is uniform, water can be effectively prevented, and water head taking or other construction can be conveniently conducted in the locking steel pipe piles. Guide columns are arranged on the two sides of a buckling connecting plate correspondingly, so that when the locking pipes and the buckling connecting plates of every two adjacent locking piles are buckled, the buckling connecting plates are matched with openings of the locking pipes, and the guide columns are matched with the inner side walls of the openings of the locking pipes. And the buckling connecting plate and the opening locking pipe are tightly buckled, and the waterproof and leaking stoppage performance between the opening locking piles is improved.
本发明涉及一种取水头施工锁口钢管桩围堰。本发明所述的一种取水头施工锁口钢管桩围堰,包括锁口钢管桩、圈梁、内支撑。通过两两扣合的锁口桩围合成方形框体结构,形成锁口钢管桩,将圈梁固定在锁口钢管桩内,同时利用所述内支撑来支撑圈梁,结构结实,受力均匀,能有效地防水,方便在锁口钢管桩内进行取水头或其他的施工。通过扣合连接板的两侧分别设置有导向柱,使相邻的两根锁口桩的所述锁口管和所述扣合连接板扣合时,所述扣合连接板与所述锁口管的开口配合、所述导向柱与所述锁口管的开口处的内侧壁配合;使所述扣合连接板与所述锁口管扣合紧密,提升了所述锁口桩之间的防水堵漏性能。
Water taking head construction locking steel pipe pile cofferdam
一种取水头施工锁口钢管桩围堰
ZHAO BINGNAN (author) / WANG JIAMING (author) / ZHAO LINJUN (author) / DU HAI (author) / NI PAI (author)
2023-04-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of opening locking type steel pipe pile cofferdam
European Patent Office | 2023
|Rock-socketed anchoring locking steel pipe pile cofferdam construction method
European Patent Office | 2023
|Grouting device for locking water of steel pipe pile cofferdam
European Patent Office | 2024
|