A platform for research: civil engineering, architecture and urbanism
Fabricated steel structure and construction method
The invention discloses an assembly type steel structure and relates to the field of steel structures, the assembly type steel structure comprises a supporting plate and a first transverse plate, the supporting plate is provided with a connecting part A, the first transverse plate is provided with a connecting part B, the connecting part A and the connecting part B are each provided with an installation groove and a protruding block, the side wall of each installation groove is provided with a semicircular groove, and the groove bottom of each semicircular groove is rotationally connected with a rotating block; the groove wall of the semicircular groove is further provided with a first receding hole, the rotating block is provided with a rotating rod, the rotating rod penetrates through the first receding hole and extends to the mounting groove, and the groove wall of the mounting groove is provided with a reset spring and is provided with a connecting part A and a connecting part B. During actual mounting, the protruding block of the connecting part A is embedded into the mounting groove of the connecting part B, so that the connecting part A and the connecting part B are embedded into the mounting groove; the rotating block is rotated until the opening of the semicircular groove of the connecting part A faces the bottom of the semicircular groove of the connecting part B, the rotating block is reset through the reset spring, in the state, the connecting part A and the connecting part B are limited by the rotating block to be separated from each other, the supporting plate and the first transverse plate are connected through connection of the connecting part A and the connecting part B, and installation is more convenient through the connection mode.
本申请公开了一种装配式钢结构,涉及钢结构的领域,其包括支撑板和第一横板,支撑板设有连接部A,第一横板设有连接部B,连接部A和连接部B均设有安装槽和凸块,安装槽侧壁设有半圆槽,半圆槽槽底转动连接有转动块,半圆槽槽壁还设有让位孔一,转动块设有转动杆,转动杆穿过让位孔一延伸至安装槽,安装槽槽壁设有复位弹簧,设置连接部A和连接部B,在实际安装时,通过将连接部A的凸块嵌入连接部B的安装槽,直至连接部A的半圆槽槽口朝向连接部B的半圆槽槽底,并通过复位弹簧进行转动块的复位,此状态下,转动块限制连接部A与连接部B相互分离,通过连接部A与连接部B的连接使得支撑板与第一横板连接,此类连接方式安装更便捷。
Fabricated steel structure and construction method
The invention discloses an assembly type steel structure and relates to the field of steel structures, the assembly type steel structure comprises a supporting plate and a first transverse plate, the supporting plate is provided with a connecting part A, the first transverse plate is provided with a connecting part B, the connecting part A and the connecting part B are each provided with an installation groove and a protruding block, the side wall of each installation groove is provided with a semicircular groove, and the groove bottom of each semicircular groove is rotationally connected with a rotating block; the groove wall of the semicircular groove is further provided with a first receding hole, the rotating block is provided with a rotating rod, the rotating rod penetrates through the first receding hole and extends to the mounting groove, and the groove wall of the mounting groove is provided with a reset spring and is provided with a connecting part A and a connecting part B. During actual mounting, the protruding block of the connecting part A is embedded into the mounting groove of the connecting part B, so that the connecting part A and the connecting part B are embedded into the mounting groove; the rotating block is rotated until the opening of the semicircular groove of the connecting part A faces the bottom of the semicircular groove of the connecting part B, the rotating block is reset through the reset spring, in the state, the connecting part A and the connecting part B are limited by the rotating block to be separated from each other, the supporting plate and the first transverse plate are connected through connection of the connecting part A and the connecting part B, and installation is more convenient through the connection mode.
本申请公开了一种装配式钢结构,涉及钢结构的领域,其包括支撑板和第一横板,支撑板设有连接部A,第一横板设有连接部B,连接部A和连接部B均设有安装槽和凸块,安装槽侧壁设有半圆槽,半圆槽槽底转动连接有转动块,半圆槽槽壁还设有让位孔一,转动块设有转动杆,转动杆穿过让位孔一延伸至安装槽,安装槽槽壁设有复位弹簧,设置连接部A和连接部B,在实际安装时,通过将连接部A的凸块嵌入连接部B的安装槽,直至连接部A的半圆槽槽口朝向连接部B的半圆槽槽底,并通过复位弹簧进行转动块的复位,此状态下,转动块限制连接部A与连接部B相互分离,通过连接部A与连接部B的连接使得支撑板与第一横板连接,此类连接方式安装更便捷。
Fabricated steel structure and construction method
一种装配式钢结构及施工方法
ZHU HAIJUAN (author) / ZHANG JUN (author) / CHENG HONGWU (author) / XIA SHUPING (author)
2023-04-18
Patent
Electronic Resource
Chinese