A platform for research: civil engineering, architecture and urbanism
High fill roadbed stamping equipment and construction method
The invention relates to the technical field of roadbed construction, and provides high-fill roadbed stamping equipment and a construction method.The high-fill roadbed stamping equipment comprises a water tank and a vibration box, a vibration structure and a soaking device are arranged in the vibration box, and a hollowed-out pressing plate is arranged at the bottom of the vibration box; the construction method comprises the following steps that the first motor and the second motor are started at the same time, the protruding block and the eccentric block are driven to rotate and vibrate, and the hollowed-out pressing plate on the vibration box is driven to vibrate and compact the high-fill roadbed; the convex block rotates from top to bottom to squeeze the water bag, so that the valve plate is opened, and water flows into the water pipe from the water bag and enters a hollow hole of the hollow pressing plate; a third motor is started, and a third rotating rod is driven to drive a vibration box to incline to adapt to the ground needing to be compacted; a fifth motor is started to drive a fourth rotating rod to drive a circular plate to rotate and slick the surface of the roadbed; according to the device, the porosity among the fillers can be reduced, the compaction effect is better, the whole process is coherent, the working efficiency is improved, and the problem that the fillers on the surface layer of the high-fill roadbed are loosened is solved.
本发明涉及路基施工技术领域,提供了一种高填方路基冲压设备及施工方法,设备包括水箱和振动箱,振动箱内设有振动结构和浸湿装置,振动箱底部设有镂空压板;施工方法,包括以下步骤:同时启动第一电机和第二电机,带动凸块和偏心块旋转振动,带动振动箱上的镂空压板震动压实高填方路基;凸块由上至下旋转挤压水囊,使阀片打开,水流从水囊流入水管,进入镂空压板的镂空孔中;启动第三电机,驱动第三转杆带动振动箱倾斜至适配需要压实的地面;启动第五电机,驱动第四转杆带动圆板旋转刮平路基表面;本装置可以减小填料之间的孔隙率,使得压实效果更好,整个过程连贯,提升了工作效率,解决了高填方路基表面表层填料松动的问题。
High fill roadbed stamping equipment and construction method
The invention relates to the technical field of roadbed construction, and provides high-fill roadbed stamping equipment and a construction method.The high-fill roadbed stamping equipment comprises a water tank and a vibration box, a vibration structure and a soaking device are arranged in the vibration box, and a hollowed-out pressing plate is arranged at the bottom of the vibration box; the construction method comprises the following steps that the first motor and the second motor are started at the same time, the protruding block and the eccentric block are driven to rotate and vibrate, and the hollowed-out pressing plate on the vibration box is driven to vibrate and compact the high-fill roadbed; the convex block rotates from top to bottom to squeeze the water bag, so that the valve plate is opened, and water flows into the water pipe from the water bag and enters a hollow hole of the hollow pressing plate; a third motor is started, and a third rotating rod is driven to drive a vibration box to incline to adapt to the ground needing to be compacted; a fifth motor is started to drive a fourth rotating rod to drive a circular plate to rotate and slick the surface of the roadbed; according to the device, the porosity among the fillers can be reduced, the compaction effect is better, the whole process is coherent, the working efficiency is improved, and the problem that the fillers on the surface layer of the high-fill roadbed are loosened is solved.
本发明涉及路基施工技术领域,提供了一种高填方路基冲压设备及施工方法,设备包括水箱和振动箱,振动箱内设有振动结构和浸湿装置,振动箱底部设有镂空压板;施工方法,包括以下步骤:同时启动第一电机和第二电机,带动凸块和偏心块旋转振动,带动振动箱上的镂空压板震动压实高填方路基;凸块由上至下旋转挤压水囊,使阀片打开,水流从水囊流入水管,进入镂空压板的镂空孔中;启动第三电机,驱动第三转杆带动振动箱倾斜至适配需要压实的地面;启动第五电机,驱动第四转杆带动圆板旋转刮平路基表面;本装置可以减小填料之间的孔隙率,使得压实效果更好,整个过程连贯,提升了工作效率,解决了高填方路基表面表层填料松动的问题。
High fill roadbed stamping equipment and construction method
高填方路基冲压设备及施工方法
XU DAZHONG (author) / JIANG YISHUN (author) / LEE SANG-HOO (author) / GE YUNING (author) / LI HAIZHI (author) / SU ZHIYE (author) / ZHAO DESHENG (author) / YUAN JIKUI (author) / ZHOU WANDONG (author)
2023-05-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Highway high-fill roadbed construction device and construction method
European Patent Office | 2023
|