A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of building construction, in particular to a basement post-cast strip waterproof leaking stoppage construction technology which comprises a cement base layer, a first waterproof plate is arranged on the top of the cement base layer, an inorganic matter grouting material layer is laid on the top of the first waterproof plate, and a second waterproof plate is arranged on the top of the inorganic matter grouting material layer. The top of the first waterproof plate is filled with cement mortar, and a post-cast strip boundary waterproof plate is mounted at the top of the cement mortar; the first waterproof plate and the second waterproof plate are arranged, materials of all layers can be conveniently isolated, the anti-seepage effect of the materials of all layers is improved, the fluidity of cement mortar of different heights is improved by arranging the grouting openings of different heights, the construction efficiency of constructors is improved, the horizontal distance between the first grouting pipe and the second grouting pipe is set to be one meter, and the construction efficiency is improved. And according to the fluidity setting of the cement mortar, the phenomenon that the cement mortar is limited by the fluidity, and grouting is uneven is prevented, and the grouting quality is improved.
本发明涉及建筑施工技术领域,具体为一种地下室后浇带防水堵漏施工工艺,包括水泥基层,所述水泥基层的顶部设置有第一防水板,且第一防水板的顶部铺设有无机物灌浆料层,并且无机物灌浆料层的顶部设置有第一防水板,所述第一防水板的顶部灌注有水泥砂浆,且水泥砂浆的顶部安装有后浇带边界防水板;本发明设置有第一防水板与第二防水板,便于将各层材料进行隔离,提高各层材料的防渗漏效果,通过设置不同高度的注浆口,提高不同高度的水泥砂浆的流动性,提高施工人员施工效率,第一灌浆管与第二灌浆管的水平距离设置为一米,依据水泥砂浆的流动性设置,防止水泥砂浆受流动性限制,出现注浆不均的现象,提高了注浆的质量。
The invention relates to the technical field of building construction, in particular to a basement post-cast strip waterproof leaking stoppage construction technology which comprises a cement base layer, a first waterproof plate is arranged on the top of the cement base layer, an inorganic matter grouting material layer is laid on the top of the first waterproof plate, and a second waterproof plate is arranged on the top of the inorganic matter grouting material layer. The top of the first waterproof plate is filled with cement mortar, and a post-cast strip boundary waterproof plate is mounted at the top of the cement mortar; the first waterproof plate and the second waterproof plate are arranged, materials of all layers can be conveniently isolated, the anti-seepage effect of the materials of all layers is improved, the fluidity of cement mortar of different heights is improved by arranging the grouting openings of different heights, the construction efficiency of constructors is improved, the horizontal distance between the first grouting pipe and the second grouting pipe is set to be one meter, and the construction efficiency is improved. And according to the fluidity setting of the cement mortar, the phenomenon that the cement mortar is limited by the fluidity, and grouting is uneven is prevented, and the grouting quality is improved.
本发明涉及建筑施工技术领域,具体为一种地下室后浇带防水堵漏施工工艺,包括水泥基层,所述水泥基层的顶部设置有第一防水板,且第一防水板的顶部铺设有无机物灌浆料层,并且无机物灌浆料层的顶部设置有第一防水板,所述第一防水板的顶部灌注有水泥砂浆,且水泥砂浆的顶部安装有后浇带边界防水板;本发明设置有第一防水板与第二防水板,便于将各层材料进行隔离,提高各层材料的防渗漏效果,通过设置不同高度的注浆口,提高不同高度的水泥砂浆的流动性,提高施工人员施工效率,第一灌浆管与第二灌浆管的水平距离设置为一米,依据水泥砂浆的流动性设置,防止水泥砂浆受流动性限制,出现注浆不均的现象,提高了注浆的质量。
Waterproof and leaking stoppage construction process for basement post-cast strip
一种地下室后浇带防水堵漏施工工艺
YI QIHONG (author)
2023-05-09
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement post-cast strip leaking stoppage grouting and reinforcing construction method
European Patent Office | 2020
|Basement post-cast strip grouting leaking stoppage and reinforcement construction method
European Patent Office | 2021
|