A platform for research: civil engineering, architecture and urbanism
I-shaped main edge and formwork reinforcing construction method thereof
The invention discloses an I-shaped main ridge and a formwork reinforcing construction method thereof, and particularly relates to the technical field of formwork reinforcing construction.The I-shaped main ridge comprises a first reinforcing formwork, a second reinforcing formwork is arranged on one side of the first reinforcing formwork, and a multi-point-position supporting mechanism is arranged in the first reinforcing formwork and located at the midline position of the first reinforcing formwork; a locking assembly is fixed to the position, close to the top of the first reinforcing formwork, of one side of the first reinforcing formwork, and a separation positioning assembly is arranged between the first reinforcing formwork and the second reinforcing formwork. According to the invention, the loss of the template is basically avoided after the template is removed, the secondary turnover use is not seriously influenced, the stability of the edge connecting part is better, the edge fitting is firmer, the repeated turnover disassembly use is convenient, and the stability of the middle forming of the concrete forming is improved.
本发明公开了一种工字型主楞及其模板加固施工方法,具体涉及模板加固施工技术领域,包括第一加固模板,所述第一加固模板的一侧设有第二加固模板,所述第一加固模板的内部且位于其中线位置处设有多点位支撑机构,所述第一加固模板的一侧且靠近其顶部位置处固定有锁紧组件,所述第一加固模板和第二加固模板之间位置处设有脱离定位组件。本发明拆模后对模板的损耗基本没有,不会严重影响二次周转使用,而且边缘连接处稳定性更好,边缘贴合更加牢固,便于多次周转拆卸使用,而且提高混凝土成型的中部成型的稳定性。
I-shaped main edge and formwork reinforcing construction method thereof
The invention discloses an I-shaped main ridge and a formwork reinforcing construction method thereof, and particularly relates to the technical field of formwork reinforcing construction.The I-shaped main ridge comprises a first reinforcing formwork, a second reinforcing formwork is arranged on one side of the first reinforcing formwork, and a multi-point-position supporting mechanism is arranged in the first reinforcing formwork and located at the midline position of the first reinforcing formwork; a locking assembly is fixed to the position, close to the top of the first reinforcing formwork, of one side of the first reinforcing formwork, and a separation positioning assembly is arranged between the first reinforcing formwork and the second reinforcing formwork. According to the invention, the loss of the template is basically avoided after the template is removed, the secondary turnover use is not seriously influenced, the stability of the edge connecting part is better, the edge fitting is firmer, the repeated turnover disassembly use is convenient, and the stability of the middle forming of the concrete forming is improved.
本发明公开了一种工字型主楞及其模板加固施工方法,具体涉及模板加固施工技术领域,包括第一加固模板,所述第一加固模板的一侧设有第二加固模板,所述第一加固模板的内部且位于其中线位置处设有多点位支撑机构,所述第一加固模板的一侧且靠近其顶部位置处固定有锁紧组件,所述第一加固模板和第二加固模板之间位置处设有脱离定位组件。本发明拆模后对模板的损耗基本没有,不会严重影响二次周转使用,而且边缘连接处稳定性更好,边缘贴合更加牢固,便于多次周转拆卸使用,而且提高混凝土成型的中部成型的稳定性。
I-shaped main edge and formwork reinforcing construction method thereof
一种工字型主楞及其模板加固施工方法
XIAO JIWEI (author) / WANG JIANGTAO (author) / JIA JINGFENG (author) / SUN TIANSHUN (author) / HAN YING (author) / WANG CHAO (author) / MOON CHAN-KUM (author) / MENG JIN (author) / HAO YAMIN (author) / HAN WEI (author)
2023-05-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Special-shaped column formwork reinforcing device and construction method thereof
European Patent Office | 2022
|Arc-shaped shear wall formwork main keel reinforcing system
European Patent Office | 2024
|Edge beam and formwork reinforcing device and construction method thereof
European Patent Office | 2022
|Novel formwork steel backing edge reinforcing construction method
European Patent Office | 2022
|Strip-shaped foundation formwork reinforcing component and construction method
European Patent Office | 2023
|