Concrete structure buried culvert inner and outer mold trolley and construction method thereof
The invention discloses a concrete structure concealed culvert inner and outer mold trolley which comprises an outer mold trolley and a plurality of inner mold trolleys, and all the inner mold trolleys are arranged in the outer mold trolley side by side. The outer mold trolley comprises an outer mold plate assembly, an outer portal frame assembly, an outer translation mechanism and an outer walking mechanism, the outer mold plate assembly comprises two side molds, the two side molds form a cross section, the two side molds are connected to the inner sides of the side edges of the outer portal frame assembly respectively, and each side mold is formed by connecting a plurality of sections of mold plates through bolts; the telescopic end of the outer translation mechanism is connected to a cross beam of the outer portal frame assembly; according to the concrete structure concealed culvert inner and outer formwork trolley, construction is rapid and efficient, side wall and top plate synchronous structure concrete pouring is achieved, and compared with a conventional full framing construction method, time is saved by 50%.
本发明公开了一种混凝土结构暗涵内外模台车,包括一个外模台车和若干内模台车,所有的所述内模台车均并列设置在所述外模台车内;所述外模台车包括外模板总成、外门架总成、外平移机构以及外行走机构,所述外模板总成包括两块边模,二者构成横断面,两块边模分别连接于所述外门架总成的侧边内侧,每块边模由若节模板通过螺栓连接组成;所述外平移机构的伸缩端连接于所述外门架总成的横梁上;所述外行走机构设置在所述外门架总成底部,本发明的混凝土结构暗涵内外模台车施工快速、高效,实现边墙和顶板同步结构混凝土浇筑,较常规满堂支架施工方法节省时间50%。
Concrete structure buried culvert inner and outer mold trolley and construction method thereof
The invention discloses a concrete structure concealed culvert inner and outer mold trolley which comprises an outer mold trolley and a plurality of inner mold trolleys, and all the inner mold trolleys are arranged in the outer mold trolley side by side. The outer mold trolley comprises an outer mold plate assembly, an outer portal frame assembly, an outer translation mechanism and an outer walking mechanism, the outer mold plate assembly comprises two side molds, the two side molds form a cross section, the two side molds are connected to the inner sides of the side edges of the outer portal frame assembly respectively, and each side mold is formed by connecting a plurality of sections of mold plates through bolts; the telescopic end of the outer translation mechanism is connected to a cross beam of the outer portal frame assembly; according to the concrete structure concealed culvert inner and outer formwork trolley, construction is rapid and efficient, side wall and top plate synchronous structure concrete pouring is achieved, and compared with a conventional full framing construction method, time is saved by 50%.
本发明公开了一种混凝土结构暗涵内外模台车,包括一个外模台车和若干内模台车,所有的所述内模台车均并列设置在所述外模台车内;所述外模台车包括外模板总成、外门架总成、外平移机构以及外行走机构,所述外模板总成包括两块边模,二者构成横断面,两块边模分别连接于所述外门架总成的侧边内侧,每块边模由若节模板通过螺栓连接组成;所述外平移机构的伸缩端连接于所述外门架总成的横梁上;所述外行走机构设置在所述外门架总成底部,本发明的混凝土结构暗涵内外模台车施工快速、高效,实现边墙和顶板同步结构混凝土浇筑,较常规满堂支架施工方法节省时间50%。
Concrete structure buried culvert inner and outer mold trolley and construction method thereof
一种混凝土结构暗涵内外模台车及其施工方法
DUAN CHAOJIE (author) / MEN WENBO (author) / HE ZHIJIA (author) / CHEN RONGGUO (author) / JIANG LIQING (author) / ZHENG CHANGBING (author) / XIE YAFEI (author) / WANG WENYUAN (author)
2023-05-12
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
European Patent Office | 2024
|Fabricated trolley for box culvert construction and construction method thereof
European Patent Office | 2020
|Culvert inner supporting structure and construction method thereof
European Patent Office | 2021
|Box culvert side wall formwork moving trolley structure and construction method thereof
European Patent Office | 2023
|