A platform for research: civil engineering, architecture and urbanism
Construction method of integrated attached scaffold
The invention relates to the technical field of building construction, in particular to a construction method of an integrated attached scaffold, which comprises the following steps: S1, separating a brake assembly from an adjusting lifting assembly; s2, the standing plate is lifted to a first construction height; s3, fixing the standing plate; s4, the standing plate reaches the second construction height; repeating the steps S3 and S4 until the construction task is completed; the lifting adjusting assembly is driven by the driving motor to work, the height of the standing plate can be automatically adjusted, the standing plate is braked through the braking assembly, the safety of the standing plate is improved through the stabilizing assembly, manual operation is not needed, time is saved, and the construction safety is greatly improved.
本发明涉及建筑施工技术领域,尤其涉及一种集成附着式脚手架的施工方法,包括:S1、制动组件与调节升降组件分离;S2、站板升至第一施工高度;S3、站板的固定;S4、站板到达第二施工高度;重复步骤S3、S4,直至完成施工任务;通过驱动电机驱动升降调节组件工作,能够自动的对站板的高度进行调整,通过制动组件对站板进行制动,通过稳固组件提高站板的安全性,无需人工操作,节省了时间,且极大地提高了施工的安全性。
Construction method of integrated attached scaffold
The invention relates to the technical field of building construction, in particular to a construction method of an integrated attached scaffold, which comprises the following steps: S1, separating a brake assembly from an adjusting lifting assembly; s2, the standing plate is lifted to a first construction height; s3, fixing the standing plate; s4, the standing plate reaches the second construction height; repeating the steps S3 and S4 until the construction task is completed; the lifting adjusting assembly is driven by the driving motor to work, the height of the standing plate can be automatically adjusted, the standing plate is braked through the braking assembly, the safety of the standing plate is improved through the stabilizing assembly, manual operation is not needed, time is saved, and the construction safety is greatly improved.
本发明涉及建筑施工技术领域,尤其涉及一种集成附着式脚手架的施工方法,包括:S1、制动组件与调节升降组件分离;S2、站板升至第一施工高度;S3、站板的固定;S4、站板到达第二施工高度;重复步骤S3、S4,直至完成施工任务;通过驱动电机驱动升降调节组件工作,能够自动的对站板的高度进行调整,通过制动组件对站板进行制动,通过稳固组件提高站板的安全性,无需人工操作,节省了时间,且极大地提高了施工的安全性。
Construction method of integrated attached scaffold
一种集成附着式脚手架的施工方法
ZHOU JIANG (author) / KUANG LEI (author) / LIU RENTAN (author) / ZHAO PENGCHONG (author) / ZHANG ZHEN (author) / LI SHAOBO (author) / CUI YAO (author) / ZHANG KANG (author) / YANG ZHENPING (author)
2023-05-16
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of integrated attached lifting scaffold
European Patent Office | 2023
|Integrated attached lifting scaffold and construction method thereof
European Patent Office | 2020
|